![Hankscraft Runxin HS Series Service Manual Download Page 22](http://html1.mh-extra.com/html/hankscraft-runxin/hs-series/hs-series_service-manual_3618730022.webp)
HS / HL Valves & Systems Service Manual
Hankscraft Runxin, LLC 300 Wengel Drive 608.524.9465 hrh2o.com [email protected]
22
3.
Rotate program wheel counterclockwise until it stops at the regeneration position.
4.
Manually index valve to Backwash position; allow water to flow to the drain for 3 or 4 minutes for
color throw.
5.
Remove back cover plate. Make sure the salt wheel is set to desired dosage.
6.
Manually index the valve to the Brine Refill position and allow the brine tank to fill to the top of
the air check.
7.
Manually index the valve to the Brine Rinse position and allow the valve to draw water from the
brine tank until it stops.
8.
Plug the valve into an approved power source. Preferably a GFI grounded outlet. Look in the sight
hole in the back of the motor to see that it is running.
9.
Manually advance the valve to the beginning of the Brine Refill position and allow the valve to
return to the In Service position automatically. This will fill the brine tank with the correct
amount of water.
10.
Add salt into the brine tank (40 lbs. minimum, 120 lbs. maximum) and install brine tank cover.
We recommend using pellet salt, NOT solar or rock salt.
11.
Replace back cover on the valve. Be sure cable is not pinched between cover and housing.
12.
Turn a faucet on, away from the installation location, until the water from the plumbing lines has
been purged.
13.
Softening system is now fully operational.
14.
Take a water sample to verify and test for hardness reduction.