2. Installation Directions
2.1 Packing Inspection
· Check packing conditions very carefully after arrival of centrifuge.
· Contact Hanil Science Industrial Co Ltd immediately if damages found .
· You can get contact details on packing boxes and outer cover of manual.
2.2 Installation directions
· Installation on hard and flat ground : Centrifuge should be installed on hard and flat
ground. In case centrifuge is located on incline place, spindle can be bent due to
heavy weight of rotor as centrifuge is rotating in condition of spindle inclined for long
period of time.
· Smooth air circulation : Centrifuge should be located in leaving 30cm of room from
both sides and the back for smooth air circulation. Especially, air circulation is not going smoothly
if air vent on the case is covered with cloth or blocked by other equipment.
Avoid dusty place to install centrifuge.
· Constant temperature and humidity : Centrifuge is influenced by external environment
such as temperature or humidity as it is controlled by a high degree of electromagnetic
controller. Do not install centrifuge close to direct light or heater.
Keep centrifuge in proper temperature and humidity.
· Place unable to produce corrosive gas : Install centrifuge on the place unable to produce
corrosive gas. Rotor and spindle can be corrosive and metal parts can be damaged if
centrifuge contacts pyrosulfuric gas and chloric gas.
· Balancing : Centrifuge should be leveling for spindle of equipment to be vertical to the
ground. Balance a centrifuge by using a water level if required.
www.ihanil.com
5
Summary of Contents for Smart R17
Page 1: ...Operation Manual Smart R17 Micro Centrifuge...
Page 18: ...6 Rotor and Accessories Guide 18 www ihanil com...
Page 19: ...7 www ihanil com 19...
Page 20: ...7 20 www ihanil com...
Page 21: ...MEMO...