background image

2. Installation Directions

2.1 Packing Inspection

· Check packing conditions very carefully after arrival of centrifuge.

· Contact Hanil Science Industrial Co Ltd immediately if damages found  .

· You can get contact details on packing boxes and outer cover of manual.

2.2 Installation directions

· Installation on hard and flat ground  : Centrifuge should be installed on hard and flat 

ground. In case centrifuge is located on incline place, spindle can be bent due to
heavy weight of rotor as centrifuge is rotating in condition  of spindle inclined for long
period of time.

· Smooth air circulation : Centrifuge should be located in leaving 30cm of room from 

both sides and the back for smooth air circulation. Especially, air circulation  is not going smoothly
if air vent on the case is covered with cloth or blocked by other equipment.
Avoid dusty place to install centrifuge.

· Constant temperature and humidity : Centrifuge is influenced  by external environment

such as temperature or humidity as it is controlled by a high degree of electromagnetic
controller. Do not install centrifuge close to direct light or heater.
Keep centrifuge in proper temperature and humidity.

· Place unable to produce corrosive gas  : Install centrifuge on the place unable to produce

corrosive gas. Rotor and spindle can be corrosive and metal parts can be damaged if
centrifuge contacts pyrosulfuric gas and chloric gas.

· Balancing : Centrifuge should be leveling for spindle of equipment  to be vertical to the

ground. Balance a centrifuge by using a water level if required.

www.ihanil.com

5

Summary of Contents for Smart R17

Page 1: ...Operation Manual Smart R17 Micro Centrifuge...

Page 2: ...onents 3 3 Specifications 3 4 Controller 3 5 RPM RCF Input 3 6 Time Input 4 Cleaning and Maintenance 4 1 General check points 4 2 Cleaning 1 4 Electric safety information 3 7 Accel Decel Setting 5 Tro...

Page 3: ...geis contaminatedwithdangerousmaterialssuch aspathogenic toxicandradioactivesubstances 6 Donot perform centrifugationofmaterialscapableof producingvolatileandexplosiblesteam 7 Donot operate equipmentm...

Page 4: ...power cord 5 Donotinsert anything into aslot or hole ofequipment 6 Donotblock aventilating opening 7 Ifyouhave thefollowing emergencies shut off thepower supply and pick outthe power cord from outlet...

Page 5: ...r smooth aircirculation Especially aircirculation isnot going smoothly if air vent on the case is covered with cloth or blocked by other equipment Avoid dusty place to install centrifuge Constant temp...

Page 6: ...check balance of adapters tubes or plates by using a scale and they become symmetric Clean a motor spindle and rotor holes with a dry cloth before you install a rotor When you tighten a rotor on a mot...

Page 7: ...antities are same If tubes are not symmetrical in quantity new tubes should be inserted to keep balance User is encouraged to use a scale to minimize the difference of volume between tubes containing...

Page 8: ...nected to a spindle and rotates after you arrange tubes containing samples Controller This is where you can set up data such as RPM TIME Temperature and etc Power switch This is where you can switch O...

Page 9: ...M Max RCF Max Capacity Time DEC ramps Power supply Dimension W x D x H mm Weight kg Cat No ACC ramps 1 5 2 0ml x 24 Fixed Angle 0 2ml x 32 PCR Rotor 23 005xg 99min 59sec 6 steps 6 steps AC 220V 60Hz 2...

Page 10: ...key This istoselect setting menu asleft and right button of direction key 1 This istoreduce setvalue ofprogram and select programs asthe lower button of direction key 2 This isfor FastCool function T...

Page 11: ...ft or Right button to move to TIME position 3 Press Up or Down button to change a set value 4 Press the Setup Enter button to complete You can set up time up to 99min 59sec 3 7 Accel Decel Setting 1 I...

Page 12: ...wn button for about 2 seconds A rotor rotates with 1 500RPM and if equipment reaches to the previously set temperature a rotor decelerates with very fast speed If a rotor stops standby mode comes up S...

Page 13: ...press Call Save button 3 Press the Setup Enter button to set menus The initial menu is to set RPM in set up mode 4 Input the desired RPM by pressing up down button If you press up down button for abou...

Page 14: ...er that can damage products Clean the damaged part with a cloth soaked with a good quality of a neutral detergent 3 Make sure do not scratch the surface of equipment when cleaning it Do not use a meta...

Page 15: ...lean it with a soft cloth soaked with warm water immediately At this moment make sure do not scratch the surface treated specially Drying Keep a narrow groove of a rotor dry with care Hair dryer will...

Page 16: ...y not reaching 200RPM within 2 secs Check controller and motor Switch power off and re start E5 Door open Start Door open during operation Check door in switch E6 Under speed 2 under the set RPM durin...

Page 17: ...rgency lid open system manually 1 Switch off main power Wait till a rotor stops through RPM measuring window 2 As the below picture Insert a flathead screwdriver into emergency lib open system on the...

Page 18: ...6 Rotor and Accessories Guide 18 www ihanil com...

Page 19: ...7 www ihanil com 19...

Page 20: ...7 20 www ihanil com...

Page 21: ...MEMO...

Page 22: ...Hanil Scientific Inc 16 Arayukro Gimpo 10136 Rep of KOREA Tel 82 2 3452 8965 info ihanil com www ihanil com Fax 82 70 4275 5747...

Reviews: