120
(
5
)
Make sure the inlet and outlet shutoff valve
(
4,8
)
are closed.
(
6
)
Connect the inlet connector
(
10
)
with outlet valve
(
9
)
, and tighten
(
7
)
Open outlet shutoff valve
(
8
)
slowly.
(
8
)
Make sure there is no leakage before using, if there is leakage, close outlet shutoff valve
(
8
)
in time, turn on the forklift input connector
(
3
)
.
Note
:
After installing cylinder, then connect the connecting pipe with quick connector, open outlet
shutoff valve
(
8
)
, smear every joint with soap bubble to check whether the joint is leaking, if there
is leaking at joint, eliminate the problem, then operate forklift. Close outlet shutoff valve
(
8
)
when
finished operating forklift.
10.
Cylinder fixed way
:
Metal belt bracket
The fixed way is opposite to disassembly.
Buckle belt bracket
a. Hold restraint with right hand, take
buckle belt with left hand, direct to the
notch on ratchet wheel
b.
Pass buckle belt through the notch
on ratchet wheel.