3) Slowly raise the tines until the bale
clears the ground.
4) Remove strings, twine, or wrapping
from the bale.
1) Lower bale tines to ground.
2) Back processor up with the bale tines
sliding under the bale.
-
4.8
-
5)
Raise the bale tines up and tip the bale
into the bale cradle.
4.7
Field Operation
*** STOP CRADLE WHEN LOADING BALES INTO PROCESSOR ***
4.7.1
Loading and Processing
*** STOP CRADLE WHEN LOADING BALES INTO PROCESSOR ***
Summary of Contents for 2957
Page 4: ...1 3...
Page 5: ...1 4...
Page 6: ...1 5 Page Intentionally left Blank...
Page 14: ...3 2 3 Safety Decal Locations...
Page 15: ...3 3 3 Safety Decal Locations...
Page 17: ...3 5 3 2 Information Decal Locations...
Page 35: ...5 5 5 4 PTO...
Page 42: ...7 3 Bolt Torque 7 2...
Page 43: ...7 3 7 4 Overall Dimensions...
Page 48: ...Notes 10 1...
Page 49: ......
Page 50: ...H S MFG CO Products approved for the FEMA SEAL OF QUALITY...