AI-118 operation manual
issue 1 19.10.07 display version 07 . plc controller version 07
P.14 of 50
Preparation for Installation
Installation must be carried out by authorized personnel. Follow the steps below:
1. Position the machine on a flat surface and allow at least 50cm clearance on both sides as
well as the back side, this is essential for the hot air ventilation and also to allow enough room
for maintenance personnel to carry out necessary service and maintenance
2. Adjust the foot stand so that the machine is level and stable.
3. Loosen all packing cable ties and materials in order to free up all machine movements.
4. Connect the power plug to a suitable outlet with 220V, 16A capacity.
5. Locate the air hose supplied with the machine. Connect one end to the inlet of the
compressed air water filter at the back side of the machine; connect the other end to a
compressed air supply such as air compressor or central air supply. Make sure the
compressed air supply has at least 0.6 Mpa (6 bar) of pressure and a flow rate of not less
than 100L/min.
6. Install the tensioner at the top of the machine and align the tape spool at right angle to the
working table of machine. (see diagram below)
fix the tensioner
Figure 7 Fix the Tensioner