14.09.2020
95 / 156
VARMAX -
Installation, Use and Maintenance
L
N L3
N
L3 L
N
QX2
QX3
QX1
Mains supply 230
VAC 50 Hz
}
}
Alarm
relay
Insulating
valve Q1.2
D. SPECIFIC START-UP PROCEDURE
"
Fit the accessories and make their electrical connections.
"
Start up the boiler alone.
"
Make the following settings:
On boiler No. 1: master
Line No. Value
• Set the time and date:
Time and date
menu
Set the time
Time / minute (1)
HH.MM
Set the date
Day / month (2)
DD.MM
Set the year
Year (3)
YYYY
• Configuration
menu
Start up the heating circuit 1
Heating circuit 1 (5710)
On
Diagram VX200 only:
Configure the pump Q2
QX2 relay outlet (5891)
Pump HC1 Q2
All diagrams:
Configure flow sensor in cascade B10
Sensor input BX2 (5931)
Common flow
sensor B10
Diagrams: VX200 / VX201
page 3 / 6
}
LPB bus
MB DB