Adding a large amount of untreated water always contributes a significant amount of scaling. To monitor this and 

to detect problems, 

a system water meter must be installed. 

Failure to comply with these guidelines (such that the fill water plus the make-up water is more than three times 

the water capacity of the heating system) requires a full cleaning (to remove sludge and scaling) to be performed. 

 

Additional precautions are required for operation: 

  When the unit has a water softener, the equipment must be inspected on a regular basis in order to ensure 

that it is not outputting chloride-rich water into the system. The concentration of chlorides must always 

remain below 50 mg/l. 

  To prevent the build-up of calcium deposits (such as on exchange surfaces), the unit should be brought into 

service slowly, starting by operating at a low power with high primary water flow. 

  When the tap water lacks the desired qualities, 

water treatment is required

. The fill water must be treated, 

and whenever new water is added, the make-up water must also be treated. 

  Installations with multiple boilers require all of the boilers to be brought up simultaneously at minimal power. 

Doing this prevents the calcium in the water from depositing on the exchange surfaces of the first boiler. 

  When  working on the unit, avoid draining it completely; only the required parts of the system are to be 

drained. 

 

The rules listed above are designed to minimize scaling on the exchange surfaces and thus to increase the life of 

the boilers. 

To optimize how the equipment operates, plan to remove its calcium deposits. This must be done by a specialized 

company. Also, before putting the unit into service, verify that the heating system is not damaged (ex. leaks). If it 

has excessive scaling, the unit's settings for operation and for water treatment must be adjusted. 

 

Protecting steel and stainless-steel boilers against corrosion 

Corrosion can affect the iron components used in boilers and heating systems, which is directly related to the 

presence of oxygen in the water heater's water. Dissolved oxygen that enters the unit when it is being filled for the 

first time reacts with the equipment materials and quickly disappears. Without refreshing the oxygen through 

significant contributions of water, the unit might not experience any damage whatsoever. 

However, it is important to follow the sizing rules and installation guidelines in order to prevent oxygen from 

continuously flowing into the heating water. From these rules, we have: 

  Preferably an expansion vessel with a membrane rather than an open expansion vessel that allows direct 

passage 

  Internal pressure with the unit of more than 1 bar cold 

  Remove leaky (permeable) components that are letting out more gas than as if they were sealed. 

If the guidelines above are followed, the unit's system water has the proper characteristics to last a long time: 

8.2 < pH < 9.5 with a water concentration of < 0.1 mg/l. 

 

If there is a chance that oxygen could enter the unit, you must take additional precautions. Adding an oxygen 

scavenger (ex. sodium sulphite) is highly recommended. We recommend directing any water treatment questions 

to specialists, which can provide: 

- The appropriate treatment based on the characteristics of the unit 

- A monitoring agreement with a guarantee as to the results 

 

For units in which 

the water comes into contact with heterogeneous materials

, such as copper or aluminum, 

appropriate treatment is recommended 

in order to ensure that the unit will last. In most cases, this consists of 

adding corrosion inhibitors (in the form of chemical solutions) to the unit. Referring to a water treatment specialist 

is recommended. 

 

Setting up a filtration system 

A filtration system on the back of the boiler is recommended in order to remove suspended particles from the unit. 

 

Choice of burner / boiler 

We recommend adopting modulating burners to avoid thermal shock in operation. 

 

Hydraulic 

Set up an effective degasser as close as possible to the boiler outlet to evacuate the air from the networks 

introduced during the filling and the addition of water in order to maintain a good convection coefficient. 
Add an additional expansion vessel if the characteristics of the pressure maintenance unit do not allow the 

pressure variations to be limited to 0.5 bar in order to limit the variations in hydraulic pressure. 
Respect the minimum flow rates recommended. (chapter 4.6.1 to 4.7.2) 

 

Exploitation 

The frequency of cold starts should be as low as possible; during these periods, the flue gas temperature can be 

low and cause condensation that is detrimental to the life of the boiler; it is recommended not to exceed a cold 

start per week. 

Summary of Contents for Melbury C 1150

Page 1: ...Manual Melbury GB doc edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF Installation and operating instructions Melbury HE C 530 3000...

Page 2: ......

Page 3: ...al equipment 20 5 4 Heating regulators 20 5 5 Cable sets 20 6 Installation guide 21 6 1 Boiler room and boiler room ventilation 21 6 2 Planning dimensions 21 6 3 Hydraulic connection 23 6 4 Electrical...

Page 4: ...parts of the body or without wearing shoes When the unit is not to be used for a longer period the main power switch on the electrical control panel must be switched off and the manual valve on the un...

Page 5: ...e control and safety mechanisms required by local regulations in force The line must be free from all impurities take particular care that foreign matter does not enter the line during installation Oi...

Page 6: ...kept down to a minimum and thermal radiation can be further reduced A revolving door gives easy access to parts of the boiler that are in contact with combustion gases This allows cleaning of combusti...

Page 7: ...pe of supply Boiler body with recuperator in Melbury HE C version flue gas collector and flue gas tube Gas tight boiler door with insulation and burner connection and flue gas fan connection if ordere...

Page 8: ...es must be thoroughly cleaned The purpose of this initial cleaning is to eliminate germs and residue that can cause deposits to form In new installations in particular residue from grease oxidized met...

Page 9: ...uipment materials and quickly disappears Without refreshing the oxygen through significant contributions of water the unit might not experience any damage whatsoever However it is important to follow...

Page 10: ...ations of the boiler must be as low as possible to ensure the highest service life The first heating must allow the evacuation of moisture from concrete doors it is necessary to avoid any heat shock a...

Page 11: ...0 150 150 200 200 200 238 238 274 292 318 344 Distance supply return j mm 950 950 950 1150 1150 1150 1493 1493 1727 1844 2000 2168 Discharge height k mm DN 80 1 100 1 100 1 115 1 115 1 125 1 110 1 110...

Page 12: ...25 1 1 1 0 1 1 1 0 1 1 07 1 1 03 1 1 00 1 1 1 0 1 Distance recuperator water studs recup backside m mm 285 285 285 305 305 335 385 385 455 flow return recuperator n DN 65 80 80 80 80 100 100 100 125...

Page 13: ...for the operating pressures of 4 8 and 10 bar g Their dimensions and performances are identical to those of the standard range of 6 bar g but their weights are different Empty weights Melbury HE 530 5...

Page 14: ...2674 2854 3096 3356 b mm 1000 1060 1130 1210 1300 1375 1445 1570 1645 c1 mm 661 712 740 790 863 875 905 965 1027 c2 mm 480 552 565 605 650 690 779 840 845 d mm 900 900 1000 1070 1210 1290 1360 1480 1...

Page 15: ...60 80 min qF 94 8 94 9 94 9 94 9 94 9 95 0 95 0 95 0 95 0 95 0 95 1 95 0 E C fficiency DIN4702 8 60 75 C N 94 4 94 6 94 5 94 8 94 6 94 8 94 8 94 7 94 6 94 7 94 8 94 7 Mass flows Fuel oil flow max 1 kg...

Page 16: ...low NG type E max 1 2 nm 3 h 58 7 63 4 69 3 76 2 87 9 97 0 125 2 142 7 182 1 208 6 273 4 331 1 min 1 2 10 0 12 9 12 9 18 1 18 1 27 4 33 5 33 5 38 5 47 8 75 9 74 9 Exhaust gas mass flow max wet kg s 0...

Page 17: ...5 16 0 17 5 21 5 22 5 29 5 34 5 37 0 45 0 55 0 73 0 84 0 Values at 3zugskessel V 01 07 lamda 1 2 CO2 12 7 OG T air 20 C rel humidity 60 p baro 100kPa 1 Boiler at 60 80 C 2 Boiler at 50 70 C Technical...

Page 18: ...ght to make changes to dimensions and construction edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF 4 7 2 Water resistance of recuperators for Melbury C Pressure resistance in relation to wat...

Page 19: ...an average boiler water temperature of tm 70 C Since the minimum power of the boiler is limited by the minimum allowable flue gas temperature the modulation range increases when the average boiler tem...

Page 20: ...temperatures TR at boiler nominal loads as well as 50 load for 180 C nominal inlet temperature Values at CO2 12 7 t water 5 K Rel humidity 60 p baro 100 kPa Condensate amount per kg of fuel oil and f...

Page 21: ...at CO2 10 t water 5 K Rel humidity 60 p baro 100 kPa Condensate amount per nm3 of gas and flue gas temperatures for different flue gas inlet temperatures and recuperator return temperatures TR at boi...

Page 22: ...tic hot water etc The steel sheet housing is ready to be mounted on top of the boiler cover or on the carrier located on the side cover The electrical diagram is attached to the control panel 5 2 Basi...

Page 23: ...are found in spray cans thinners cleaning agents degreasing agents and solvents among others In addition halogen emissions are strongly suspected in the vicinity of dry cleaners hair dressing salons s...

Page 24: ...4 4 4 4 6 6 6 U girder width S1 mm 50 50 50 55 55 55 55 55 55 55 55 55 Melbury C 530 580 630 700 800 895 1150 1300 1650 1900 2500 3000 Distance wall boiler body front D mm 1600 1700 1700 1900 1900 200...

Page 25: ...nd the water heater Boiler s maximum operating pressure and the maximum operating temperature are indicated in chapter 4 1 No minimum level of the amount of circulating water is required Damage can oc...

Page 26: ...delayed action fuse burner boiler and by an additional 6 3A delayed action fuse for each additional governor or module The quality of the supply must respect norm EN50160 voltage 10 max frequency 1 A...

Page 27: ...5 3265 Diameter FR mm 516 549 614 640 675 71 2 750 811 870 Burner connection Burner admittance diameter M mm 230 3 0 0 330 3 8 0 Burner tube lenght min max qN max max qN low NOx P mm 195 2 6 5 280 330...

Page 28: ...s oil tubes etc must not be attached to the boiler casing 6 7 3 1 Gas burner Observe the separate instructions of the burner The gas installation must be dimensioned in accordance with the gas flow ra...

Page 29: ...t flanges and cleaning covers remain accessible The chimney must be designed so that it is gas and pressure tight as well as moisture insensitive and acid resistant 6 8 3 Flue gas tubes Melbury C Depe...

Page 30: ...n pumps should be switched off and all ventilating valves opened so that the air in the system can completely escape The filling process is finished when the operating pressure has been reached 7 4 Pr...

Page 31: ...has been filled with insulation material Whether the boiler door is closed properly Whether the heating system has been filled up with water and completely vented Whether the thermostats are properly...

Page 32: ...onnect supply and burner plug Burner LED is on Press burner reset button No oil Gas pressure insufficient Add oil Call the gas board Overheat temperature LED is on Safety thermostat has come into oper...

Page 33: ...nance according to the recommendations given in the burner manual Check fuel oil level Clean boiler and chimney 9 2 Boiler cleaning Boiler should be cleaned by your chimney sweeper and engineer The cy...

Page 34: ...Melbury HE C 530 3000 32 We reserve the right to make changes to dimensions and construction edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF 10 Spare parts 10 1 Melbury HE 530 895...

Page 35: ...40058 140058 140058 140058 Turbulators 3 120284 120284 120284 120284 120284 120285 Smoke tube brush 404 120236 120236 120236 120236 120236 120237 Key 119 160235 160235 160235 160235 160235 160235 Sigh...

Page 36: ...Melbury HE C 530 3000 34 We reserve the right to make changes to dimensions and construction edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF 10 3 Melbury HE 1150 3000...

Page 37: ...oke tube brush 404 120237 120237 120238 120238 120238 120239 Key 119 160235 160235 160234 160234 160234 160234 Sight glass 117 171523 171523 171523 171523 171523 171523 Flat spring 108 122503 122503 1...

Page 38: ...nstruction edition 12 2020 Hamworthy Heating Limited Dorset BH17 ONF Wessex House New Fields Business Park Stonsford Road Poole Dorset BH17 ONF Tel 01202662500 Fax 01202 662522 seNice hamworthy heatin...

Reviews: