49
HNC3 825 / HNC3 825 perform
Setup and installation
Tool:
●
Hex key
Material:
●
Cable ties
The operating voltage is the same as the input voltage of the machine.
1.
Place the router motor in to the 43 mm collar and clamp using the nut
(10-11 Nm).
2.
Connect the power cable and rotation speed control (optional) to the portal.
3.
Fix the cable to the extraction / power cable guide using cable ties.
7.9
Install software
1.
Download the Eding CNC Software and instruction manual from the manu-
facturer (
).
2.
Install the Eding CNC software on to the PC following the manufacturers
instruction manual.
3.
Download configuration file (
).
4.
Extract Zip folder.
5.
Replace "cnc.ini" and "Spindle-0-pwmCompTable.txt" in the installation
directory (C:\CNC4.03 is the default).
1
Fig. 32: Axle compensation
1 Individual axle parameters
6.
Copy "Joint-X-pitchCompTable.txt" and "Joint-Y-pitchCompTable.txt" to the
installation directory (default: "C:\CNC4.03").
7.
Adjust individual axis parameters for axis compensation in "Joint-X-pitch-
CompTable.txt" and "Joint-Y-pitchCompTable.txt" according to the enclosed
information sheet.
Summary of Contents for HNC3 825
Page 78: ...78 Disposal...
Page 79: ......