INSTALLING THE APPLIANCE
4
17
MOUNTING THE BOILER
16
PAPER TEMPLATE
Before installing the appliance, check that the chosen location is
suitable (section 3.2), and that the requirements for flue position
(section 3.3), and minimum clearances (Fig. 1b) are satisfied.
a)
Fix the paper template in the required position (ensuring that
the necessary clearances are achieved) and mark the position
of the fixing holes as shown in Fig. 16. Three holes are
provided at each side of the wall bracket.
4.2
PREPARING THE WALL
4.1
UNPACKING THE APPLIANCE
The appliance and standard flue kit are supplied in a single box.
In addition, various optional flue kits are available as described in
section 2.6. If the appliance is to be installed without access to an
external wall, a wall liner kit is also required.
LOCATING TABS
LIFTING POINT
•
•
•
Mark the position of the flue outlet as described in Fig. 18.
Mark the position of pressure relief outlet if required and the
water and gas connections. Remove the paper template and
proceed as follows.
b)
Cut the hole in the wall for the air/flue duct. The diameter
must not be less than 100mm and the hole must be horizontal.
If the hole is not accessible from outside, it’s minimum
diameter must be sufficient to allow insertion of the wall liner
(130mm, 5
1
/
4
in). The wall liner is available as an optional
extra and must be sealed in position with mortar (or
equivalent). It is recommended that the flue assembly falls
slightly downwards away from the boiler.
c)
Drill two fixing holes using a 8mm drill and insert the wall
plugs provided in the hardware pack. If any of the holes fail
to provide a secure fixing, use one of the adjacent holes
instead.
d)
Fix the bracket into position and secure to the wall using the
two screws provided. Ensure it is level.
94
FLUE
0 100
WALL FIXING HOLES
WALL FIXING HOLES
5 SIDE CLEARANCE
5 SIDE CLEARANCE
65
115
130
18.5
65
146
PRESSURE
RELIEF
CH FLOW
GAS INLET
1/2" BSP
DHW HOT OUTLET
COLD
INLET
CH
RETURN
200 CLEARANCE
ABOVE CASE
200 CLEARANCE
BELOW CASE
CENTRE LINE OF BOILER
12
Summary of Contents for Ace High
Page 8: ...8 EXPLODED DIAGRAM for key no references see spare parts catalogue Drawing amended 8 6 00 6 ...
Page 25: ...INTERNAL WIRING DIAGRAMS 7 7 1 FUNCTIONAL FLOW WIRING DIAGRAM 23 ...
Page 26: ...7 2 ILLUSTRATED WIRING DIAGRAM 24 ...
Page 40: ...Ace Ace High Wickes Combi 82 102 05 04 ACE ACE HIGH WICKES COMBI 82 102 ...