![background image](http://html.mh-extra.com/html/hakko-electronics/monitouch-v9-series/monitouch-v9-series_troubleshooting-instructions-supplement_579891010.webp)
1
1. Before Operation
1-1
MONITOUCH Operations
1.
Before Operation
Procedure before Operation
1. Mount and install the V9 series unit on the mounting panel, and carry out wiring.
For details, refer to the V9 Series Hardware Specifications manual.
2. Install peripheral equipment, such as PLCs and temperature controllers, and carry out wiring.
For details on wiring and setting procedures, refer to the V9 Series Connection Manual.
3. Turn on the power to the V9 series unit.
4. After turning on the power to the V9 series unit for the first time in step 3, select an interface
language for the unit.
5. Transfer the screen program created using the V-SFT editor.
For details on screen program transfer, refer to page 1-2.
6. Start operation.
When the connection with controllers has been established, MONITOUCH enters RUN mode.
* If MONITOUCH does not operate normally and shows an error message, refer to Chapter 3
and eliminate the cause of the error.
V9_Maintenance_E.book 1 ページ 2014年6月2日 月曜日 午前9時45分
Summary of Contents for Monitouch V9 Series
Page 1: ...Troubleshooting Maintenance Manual ...
Page 9: ...11 Before Operation 2 Function Switches 3 System Menu 4 Status Bar MONITOUCH Operations ...
Page 33: ...1 24 4 Status Bar Please use this page freely ...
Page 94: ...2 60 3 Handling Data Changed in Local Mode Please use this page freely ...
Page 95: ...31 Error Messages 2 Troubleshooting Error Handling ...