1.
Brass Tee to Manifold “INLET” (¼” white tubing)
1. Take the white tubing leading from the brass tee (installed in step 1) and insert it into
the manifold port labeled “INLET”. Remember to push it all the way in until it stops.
2.
Manifold to Faucet (⅜” white tubing already attached to faucet)
1. Insert the ⅜” white tubing (installed in step 4) from the faucet
into the manifold port labeled “FAUCET”.
3.
Manifold to Tank (⅜” white tubing already attached to tank)
1. Take the white tubing leading from the storage tank
(installed in step 3) and insert it into the manifold port
labeled “TANK”. Remember to push it all the way in
until it stops.
4.
Air Gap to RO Membrane (¼” red tubing from faucet)
1. Insert restrictor into the end of the red tubing.
2. Attach ¼” red tubing to the 90° elbow until it stops.
3. Attach ¼” 90° elbow to the membrane drain port.
5.
Faucet to Drain Connector (⅜” red tubing from faucet)
1. Take the ⅜” red tubing from faucet and insert it all the
way into the drain connector.
COLD
HOT
6 CONNECT TUBING
1
2
3
0.95”
TUBING DO’S
Insert tubing
ALL THE WAY IN to
prevent leaking. In most cases, up to
nearly a full inch.
Wet end of tubing to more easily
insert into all inlets and outlets.
Cut excess tubing in order to prevent
crimping, kinks, loops or folds.
TUBING DONT’S
DO NOT cut tubing too short.
Always double check measurements
before cutting.
Do not bend or crimp or kink tubing.
Do not discard excess tubing.
TUBING CONNECTIONS:
1⁄₄” White: Brass Tee to Manifold
⅜” White: Manifold to Faucet
⅜” White: Manifold to Tank
1⁄₄” Red: Membrane to Faucet
⅜” Red: Faucet to Drain Connector
1
1
4
4
5
5
2
2
3
3
3
2
1
WARNING:
Faucet
will leak if
restrictor is
not installed.