Read the entire manual to familiarize yourself with the
system and determine the best location for installation.
Check and comply with all local plumbing codes.
1. Prior to installation, turn off the cold water shut-off
valve under the sink.
2.
Temporarily place system tank into the sink cabinet
(or desired location) to ensure adequate space and
proper positioning.
3. Wait to cut tubing and follow instructions below.
Measure out ⅜” white tubing from the top of the tank
to the outlet side of the system manifold and mark ⅜”
tubing. Then measure remaining length of ⅜” tubing
from the manifold to the desired location of the faucet
hole to ensure there will be enough ⅜” tubing available
for both connections. Remove system and tank from
under your sink to begin installation.
Step 1 - Install Brass Tee Fitting
Step 2 - Install System Manifold
Step 3 - Install Water Storage Tank
Step 4 - Install Faucet
BOX CONTENTS
PLAN FOR INSTALLATION
INSTALLATION OVERVIEW
PREPARE SITE FOR INSTALLATION
• Advanced plumbing
knowledge
• Tape Measure
• Utility Knife
• Screwdriver (Phillips)
• ⅛" &
⁷⁄32
" Drill Bits/Drill
• Adjustable Wrench
• Bleach
• Safety Glasses
• Pencil
• Masking Tape
• Pan or Bucket
Step 5 - Install Drain Connector
Step 6 - Connect Tubing
Step 7 - Filter Installation
Step 8 - Sanitize, Pressure Test, & Purge System
HOT
COLD
Quality Water International
®
A
B
C
K
S
D
T
E
U
U
F
N
V
G
H
PARTS INCLUDED FOR INSTALLATION
System Manifold
Carbon Filter Sump
Membrane Filter Sump
Carbon Filter Sump
RO Faucet Spout
RO Faucet Body
Water Storage Tank
Tank Connector
Eye Dropper
Plumber’s Tape
Drain Connector
Nuts & Bolts
Foam Seal
O-Ring + Faucet Base
Toggle Bolts
Flow Restrictor
90° Elbow
Mounting Screws
Brass Tee
Tubing ⅜” Red
Tubing ⅜” White
Tubing ¼” White
Carbon Filter Cartridge
Carbon Filter Cartridge
A
I
Q
B
J
R
C
K
S
D
L
T
E
M
U
F
N
V
G
O
W
X
H
P
RECOMMENDED TOOLS FOR INSTALLATION:
Quality Water International
®
A
B
E
F
N
O
T
J
K
M
L
H
S
P
R
Q
U
V
I
C
X
W