![Hagie STS 10 Operator'S Manual Download Page 51](http://html1.mh-extra.com/html/hagie/sts-10/sts-10_operators-manual_3202528051.webp)
FIG. 4.10C-4
4.10C
OPERATING SYSTEMS CONTINUED
IV.
OPERATING SYSTEMS
C. HYDRAULIC SYSTEM
Manually Folding 90’ Boom to 80’ Boom
MANUAL 90’ TO 80’ FOLD -
To convert a 90 foot boom to an 80 foot boom, manually close the solution
supply valve on the outer section (fig. 4.10C-2, item A). Remove the pin on the back side of the boom (fig.
4.10C-2, item B) so it will hinge forward (fig. 4.10C-3) and secure it with the rear pin (fig. 4.10C-4). Repeat
these steps on the other side and recalibrate the console accordingly (see the Raven manufacturer’s guide)
before spraying resumes. See page 4.10D regarding foam marker adjustment.
FIG. 4.10C-1
60/80/90 foot boom system
wit h
out er
ex t ens ions
manually folded forward.
80 feet
A
B
FIG. 4.10C-3
FIG. 4.610C-2
Summary of Contents for STS 10
Page 119: ...9 9 IX TROUBLE SHOOTING NOTES...
Page 127: ...NOTES NOTES...