SECTION 5 –
MISCELLANEOUS
5-6
5. Raise the machine by rotating the corre-
sponding Air Suspension Valves in the
CLOCKWISE (Inflate) position.
6. Engage the parking brake.
7. Turn the engine OFF before connect-
ing any hoses or electrical lines.
8. Connect all Solution, Foam Marker (if
equipped), Hydraulic and Electrical
lines.
Solution Connection (Dry Mate)
• Install Solution Connections together.
• Push both Solution Connection Cam Lock
Levers in the DOWN position.
• Rotate the bottom Solution Connection Valve in
the fully COUNTER-CLOCKWISE (Open)
position.
• Rotate the top Solution Connection Valve in the
fully COUNTER-CLOCKWISE (Open) position.
Foam Marker Connection
-If Equipped
Hydraulic and Electrical Connections
(Quick Connect Multi-Coupler)
• Install the Hydraulic/Electrical Connections
(located on the left-hand side of attachment) into
the Multi-Coupler Receptacle (located on front
left-hand side of machine), ensuring full
engagement.
Attachment Clearing Mounting Pins
-Typical View
Solution Connection Valves
and Cam Lock Levers
(Located on the front
right-hand side of machine)
-Typical View
* View shown from behind front right-hand wheel
• Solution
Connection
Valves
• Solution Connection
Cam Lock Levers
Foam Marker Connection
(Located on front
right-hand side of machine)
-Typical View
Summary of Contents for 60' HsTB 24-Row
Page 47: ......