![Hagie 60' HsTB 24-Row Operator'S Manual Download Page 29](http://html1.mh-extra.com/html/hagie/60-hstb-24-row/60-hstb-24-row_operators-manual_578961029.webp)
3-12
SECTION 3 –
OPERATING YOUR NTB
10. Press the individual Boom Solution
Valve Switches (located on the side con-
sole) to the ON position.
NOTE: Each Boom Solution Valve Switch is
equipped with an indicator light and
will illuminate when the
corresponding Boom Solution Valve
is OFF.
NOTE: Number of sections available will
depend on the number of section
valves equipped on your NTB.
11. Slowly move the Hydrostatic Drive Con-
trol Handle forward to obtain desired
ground speed.
12. Frequently observe the pressure gauge. If
the pressure drops to zero or the spray
pattern deteriorates, turn OFF the Master
Spray, Solution Pump, Main Tank Valve,
and Agitation Valve Switches until solu-
tion is refilled.
Master Spray Indicator
(Located on the Machine Display
Home Page - Field Mode)
Boom Solution Valve Switches
(Located on the side console)
-Typical View
Summary of Contents for 60' HsTB 24-Row
Page 47: ......