HADEF 22/90 Installation, Operating And Maintenance Instruction Download Page 6

 

 

 

 

 

 

5.52.653.00.01.06 

 

Transport and Storage 

 

   

CAUTION!

 

Transport  may  only  be  done  by  qualified  personnel.  No  liability  for  any  damage  resulting  from  improper 
transport or improper storage. 

 

3.1 

Transport 

 The devices are checked and if so adequately packed before delivery. 

  Do not throw or drop the equipment.  

  Use adequate means of transport. 

Transport and means of transport must be suitable for the local conditions. 

3.2 

Safety device for transport 

 

NOTICE!

 

Should a safety device for transport exist, please remove it before commissioning. 

3.3 

Storage 

  Store the equipment at a clean and dry place. 

  Protect the equipment against dirt, humidity and damage by an appropriate cover. 

  Protect hooks, wire ropes, chains and brakes against corrosion. 

 

Description  

 

 

 

4.1 

Areas of application 

The devices must be as far as possible installed in a covered room. 

If they are used in the open, protect the units against the effects of weather such as rain, hail, snow, direct 
sunshine,  dust,  etc.  -  we  recommend  to  use  a  cover  in  parking  position.  If  the  device  is  set  up  in  a 
continuously  humid  environment  with  strong  temperature  fluctuations,  the  correct  functionings  are 
endangered by the forming of condensation. 

 

During longer downtimes of motor-operated units, the brake may reduce the function by corrosion. 

 

NOTICE!

 

Use only in the intended atmosphere with a humidity of up to 100%, but not under water! 

 

 

 

   

DANGER!

 

In particular, use is not permitted: 

    in  potentially  explosive  atmospheres,  unless  the  equipment  has  been  modified  for  this  purpose  and                    

this is shown on special type plates it carries for this purpose. 

    in reactor containments 

    for transporting persons  

    for holding lifted loads 

    for scenic use 

    when persons are under suspended loads 

 

 

4.2 

Design 

 

Type 19/90 push travel trolley 

 

Type 22/90 hand geared trolley 

 

Type 22/90 E electric trolley 

 

 

Summary of Contents for 22/90

Page 1: ...Rev 06 5 52 653 00 01 06 Monorail Trolley 19 90 22 90 push travel trolley 19 90 hand geared trolley 22 90 electric trolley 22 90 E Installation Operating and Maintenance Instructions...

Page 2: ...mation 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic safety measures 5 3 Transport and St...

Page 3: ...efore delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This manual allows a safe and...

Page 4: ...ctional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators service and repai...

Page 5: ...the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons be moved Never load the devices beyond their working load lim...

Page 6: ...sible installed in a covered room If they are used in the open protect the units against the effects of weather such as rain hail snow direct sunshine dust etc we recommend to use a cover in parking p...

Page 7: ...ectric trolley 16 4 m min Weights Type bolt Size 500 kg 1 t 1 5 t 2 t 2 5 t 3 2 t 5 t 6 3 t 19 90 N1 4 1 6 8 7 8 7 8 16 6 16 6 31 5 31 5 N2 4 5 8 5 9 9 9 9 19 9 19 9 39 4 39 22 90 N1 5 4 8 1 9 2 10 9...

Page 8: ...uated on the load bars 2 of the trolley Dimension X is set by placing washers 6 from the outer to the inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs...

Page 9: ...2 3 mm 1 1 5 mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operatio...

Page 10: ...bserve the duty cycle i e intermittent operation S3 40 ED as per VDE 0530 means that in a period of 10 minutes the motor can operate no matter the height of the load for 4 minutes It is therefore irre...

Page 11: ...nnection The technical dates of the motors are to be taken from the type plates The wiring diagram is situated in the terminal box Select connection cross sections as per VDE 0100 Put sleeves on the e...

Page 12: ...ing 1 into the shaft slot 2 Insert the feather key 2 into the motor shaft 3 Fix hub 3 with retaining ring 1 4 Assemble the friction plate 4 if existent 5 Push the rotor 5 onto the hub 3 6 Lock the mag...

Page 13: ...sufficient to keep the cooling airways clean and monitor the roller bearing and its lubrication status A high temperature fat must be used if the roller bearing is replaced CAUTION Brake linings and s...

Page 14: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Page 15: ...the equipment and any materials it contains is carried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to...