HADEF 22/90 Installation, Operating And Maintenance Instruction Download Page 2

 

 

 

 

 

 

5.52.653.00.01.06 

 

 

NOTICE!

 

The installation or mounting instructions for incomplete 

machines you’ll find in chapter “Installation”. 

 

 
 

 by Heinrich de Fries GmbH 

Heinrich de Fries GmbH, Gauss Str. 20, D-40235 Düsseldorf 

 

Heinrich De Fries GmbH will be named HADEF in the following text. 

Original operating- and maintenance instructions in German language. 

Translation in other languages is made of the German original.  

A copy may be requested in writing or is available for download o

www.hadef.com

  

Subject to changes. 

 

 

Table of Contents 

1

 

Information .......................................................................................... 3

 

2

 

Safety ................................................................................................... 3

 

2.1

 

Warning notice and symbols ............................................................................................ 3

 

2.2

 

Duty of care of the owner .................................................................................................. 4

 

2.3

 

Requirements for the operating personnel ..................................................................... 4

 

2.4

 

Appropriate use ................................................................................................................. 4

 

2.5

 

Basic safety measures ...................................................................................................... 5

 

3

 

Transport and Storage ....................................................................... 6

 

3.1

 

Transport ............................................................................................................................ 6

 

3.2

 

Safety device for transport ............................................................................................... 6

 

3.3

 

Storage ............................................................................................................................... 6

 

4

 

Description .......................................................................................... 6

 

4.1

 

Areas of application .......................................................................................................... 6

 

4.2

 

Design ................................................................................................................................. 6

 

4.3

 

Functions ............................................................................................................................ 7

 

4.4

 

Important components ...................................................................................................... 7

 

5

 

Technical data ..................................................................................... 7

 

6

 

Installation ........................................................................................... 8

 

6.1

 

Trolley ................................................................................................................................. 8

 

6.2

 

Adjusting the gauge .......................................................................................................... 8

 

6.3

 

Installation on the beam .................................................................................................... 8

 

6.4

 

Tools ................................................................................................................................... 9

 

7

 

Control ................................................................................................. 9

 

8

 

Operation ........................................................................................... 10

 

9

 

Commissioning ................................................................................. 10

 

9.1

 

General ............................................................................................................................. 10

 

9.2

 

Power supply ................................................................................................................... 11

 

10

 

Safety check ...................................................................................... 11

 

11

 

Functional test .................................................................................. 11

 

11.1

 

Checks before the initial start-up ................................................................................... 11

 

11.2

 

Functional test ................................................................................................................. 11

 

12

 

Maintenance ...................................................................................... 11

 

12.1

 

General ............................................................................................................................. 11

 

12.2

 

Monitoring ........................................................................................................................ 12

 

Summary of Contents for 22/90

Page 1: ...Rev 06 5 52 653 00 01 06 Monorail Trolley 19 90 22 90 push travel trolley 19 90 hand geared trolley 22 90 electric trolley 22 90 E Installation Operating and Maintenance Instructions...

Page 2: ...mation 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 4 2 5 Basic safety measures 5 3 Transport and St...

Page 3: ...efore delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This manual allows a safe and...

Page 4: ...ctional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators service and repai...

Page 5: ...the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons be moved Never load the devices beyond their working load lim...

Page 6: ...sible installed in a covered room If they are used in the open protect the units against the effects of weather such as rain hail snow direct sunshine dust etc we recommend to use a cover in parking p...

Page 7: ...ectric trolley 16 4 m min Weights Type bolt Size 500 kg 1 t 1 5 t 2 t 2 5 t 3 2 t 5 t 6 3 t 19 90 N1 4 1 6 8 7 8 7 8 16 6 16 6 31 5 31 5 N2 4 5 8 5 9 9 9 9 19 9 19 9 39 4 39 22 90 N1 5 4 8 1 9 2 10 9...

Page 8: ...uated on the load bars 2 of the trolley Dimension X is set by placing washers 6 from the outer to the inner side X increases or from the inner to the outer side X decreases Washers 6 and rubber discs...

Page 9: ...2 3 mm 1 1 5 mm each side bigger and for trolleys from 4 t up 3 5 mm 1 5 2 5 mm each side bigger than the flange width B of the beam 6 4 Tools 7 Control Only people that are familiar with the operatio...

Page 10: ...bserve the duty cycle i e intermittent operation S3 40 ED as per VDE 0530 means that in a period of 10 minutes the motor can operate no matter the height of the load for 4 minutes It is therefore irre...

Page 11: ...nnection The technical dates of the motors are to be taken from the type plates The wiring diagram is situated in the terminal box Select connection cross sections as per VDE 0100 Put sleeves on the e...

Page 12: ...ing 1 into the shaft slot 2 Insert the feather key 2 into the motor shaft 3 Fix hub 3 with retaining ring 1 4 Assemble the friction plate 4 if existent 5 Push the rotor 5 onto the hub 3 6 Lock the mag...

Page 13: ...sufficient to keep the cooling airways clean and monitor the roller bearing and its lubrication status A high temperature fat must be used if the roller bearing is replaced CAUTION Brake linings and s...

Page 14: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Page 15: ...the equipment and any materials it contains is carried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to...

Reviews: