![Hach QC8500 Series 2 User Manual Download Page 33](http://html.mh-extra.com/html/hach/qc8500-series-2/qc8500-series-2_user-manual_577110033.webp)
31
Operation
4.1.2 Load state
During the load state, the sample loop is being filled with sample. When the valve
switches back to the inject state, the sample flowing through the sample loop is
trapped momentarily.
This sample, whose volume can be calculated from the length and inner diameter of the
tubing used, is swept on the manifold by carrier for reaction and analysis. Refer to
.
Figure 27 Load state
1
Sample loop
4
Waste line/next valve
2
Carrier line
5
Sample line/tubing from adjacent valve
3
To manifold
Summary of Contents for QC8500 Series 2
Page 2: ......
Page 6: ...4 Table of Contents ...
Page 10: ...8 Specifications ...
Page 30: ...28 Installation ...
Page 52: ...50 Operation ...
Page 84: ...82 Troubleshooting ...
Page 88: ...86 Replacement Parts and Accessories ...
Page 90: ...88 ...
Page 92: ...90 Warranty ...
Page 94: ...92 Certification ...
Page 102: ...100 Ion Chromatography ...