18
Installation
3.2.2 Apply power to the pump
To apply power to the pump:
1.
Turn on the power strip, then turn on the power switch on the back of the pump
(
). In an RP-150 Model pump, the top panel will show the set speed of 35.
3.2.3 Pump tubing installation
To install the pump tubing:
1.
Remove all of the pump cartridges. Press the cartridge holder against the pump, then
lift the cartridges out (
).
Figure 14 Power switch location
1
Power switch
Figure 15 Pump cartridge removal
1
Cartridge
2
Cartridge holder
Summary of Contents for QC8500 Series 2
Page 2: ......
Page 6: ...4 Table of Contents ...
Page 10: ...8 Specifications ...
Page 30: ...28 Installation ...
Page 52: ...50 Operation ...
Page 84: ...82 Troubleshooting ...
Page 88: ...86 Replacement Parts and Accessories ...
Page 90: ...88 ...
Page 92: ...90 Warranty ...
Page 94: ...92 Certification ...
Page 102: ...100 Ion Chromatography ...