
113
Advanced Operations
5.
The Drift Check runs 1 hour.
This test takes a reading every minute for one hour. Every
15 minutes, linear regression is used to calculate the slope
(rate of change) for the previous 15 minute interval.
6.
The last reading and slope for each 15 minute interval are
displayed. At the end of the hour, the overall values are
calculated and displayed. The test proceeds to completion.
7.
Press
Cancel
to return to Optical Checks.
6.8.3.6 Verification kit
The Verification Kit, LZV 537, (see
Section 9 on page 129
) is
designed for periodic monitoring of scattered light, photometric
accuracy and the wavelength accuracy of the spectrophotometers.
When results exceed allowable tolerances (given in the quality
control certificate), contact the manufacturer.
1.
Press
Verification Kit
in the Optical Checks menu.
2.
Press
Nominal Values
.
Summary of Contents for DR 5000
Page 2: ...2 ...
Page 6: ...6 Table of Contents ...
Page 8: ...8 Specifications ...
Page 12: ...12 General Information ...
Page 20: ...20 Start Up ...
Page 60: ...60 Standard Operations ...
Page 120: ...120 Advanced Operations ...
Page 128: ...128 Troubleshooting ...
Page 130: ...130 Replacement Parts ...
Page 132: ...132 Contact Information ...
Page 134: ...134 Limited Warranty ...