
Orbisphere 510/511/512 Analyzers - Installation
11 of 138
Operator Manual
ORBISPHERE
1
Installation
WARNING
This section provides necessary information to install and connect the instrument. The
installation of the instrument should be performed exclusively by personnel specialized
and authorized to work on electrical installations, in accordance with relevant local
regulations. Disconnect the power supply of the instrument before carrying out any work
inside the instrument. In addition, and in accordance with safety standards, it must be
possible to disconnect the power supply of the instrument in its immediate vicinity.
CAUTION:
Proper ESD (electrostatic discharge) protocols must be followed to prevent damage to
the product. All fittings must be properly seated and tightened to prevent water and dust
ingress.
1.1 Unpacking
Remove carefully the instrument and its accessories from the box and packing material,
referring to the packing list included to confirm that everything has been delivered.
Please visually inspect the instrument for shipping damage. If anything is missing or
damaged, contact the manufacturer or your dealer immediately.
You may want to retain the box and other packing material in case you later need to ship
the instrument (see
“Storage, Handling and Transportation” on page 120
). Please
dispose safely and ecologically of the box and packing material (if not stored for future
use).
Please read through this manual thoroughly before carrying out the installation.
1.2 Installation Check List
To complete the installation, proceed to the following actions:
1) Follow the installation instructions in this section carefully.
2) On completion, verify once more that everything is properly connected.
3) If using the instrument with a TC sensor it is very important to ensure the purge
gas supply has been connected properly and has been turned on.
4) Turn the instrument on.
5) Set the language.
6) Set the security levels, users ID’s and passwords.
7) Configure the instrument and measurement channels.
8) Perform a barometric sensor calibration.
9) Perform an external pressure calibration (optional).
10) Perform the gas sensor(s) calibration.
11) Perform any interference calibrations.
12) Set the alarm thresholds.
The instrument should now be ready for operation. If a problem should arise, please refer
initially to
. If the difficulty cannot be overcome, please
contact your Hach Ultra representative who will be happy to assist you.
Summary of Contents for ORBISPHERE 510
Page 1: ...Operator Manual ORBISPHERE 510 511 512 Revision G 05 11 2008 ...
Page 2: ......
Page 12: ...6 of 138 Table of Contents Orbisphere 510 511 512 Analyzers Operator Manual ORBISPHERE ...
Page 48: ...42 of 138 View Menu Orbisphere 510 511 512 Analyzers Operator Manual ORBISPHERE ...
Page 86: ...80 of 138 Inputs Outputs Menu Orbisphere 510 511 512 Analyzers Operator Manual ORBISPHERE ...
Page 110: ...104 of 138 Security Menu Orbisphere 510 511 512 Analyzers Operator Manual ORBISPHERE ...
Page 134: ...128 of 138 Specifications Orbisphere 510 511 512 Analyzers Operator Manual ORBISPHERE ...
Page 140: ...134 of 138 Glossary Orbisphere 510 511 512 Analyzers Operator Manual ORBISPHERE ...
Page 143: ...Orbisphere 510 511 512 Analyzers User Notes 137 of 138 Operator Manual ORBISPHERE User Notes ...
Page 144: ......