Verifying the installation
Installation verification flowchart
Figure6-1 Installation verification flowchart
Post-installation checklist
Table6-1 Post-installation checklist
Item
Requirements
Installation site
•
No condensation on the surface of the router or inside of the router.
•
The router is clean and dust-free.
•
No packing boxes, packing bags or other packing materials are around the
chassis.
•
The air inlet and outlet vents of the router are free from obstruction.
Router
•
All components are installed correctly.
•
Each slot is installed with a module or filler panel.
•
Fan trays are installed correctly.
Cables
•
The router is grounded reliably with the provided grounding cable. Both ends of the
grounding cable are securely connected.
•
No switch or fuse is installed on the grounding cable.
•
The power cords are connected reliably and no short circuit has occurred in power
input and output.
•
Power cords, grounding cables and fiber cables are routed and bound separately.
•
The cables are bound neatly with cable ties at an even distance.
•
The cable labels are correct, clear, and affixed to the cable in the same direction.
Start
Verify the
installation
Meet the
requirements?
Yes
No
Troubleshoot
Install the air filter
and top hood
Check before and
after power-on
End
Summary of Contents for CR19000-20
Page 11: ...1 5 Figure1 1 Chassis dimensions...
Page 39: ...2 9 Figure2 7 Securing the router to the rack...
Page 61: ...4 2 Figure4 1 Slot arrangement...
Page 84: ...6 5 Figure6 4 Installing an air filter...
Page 97: ...8 9 Figure8 9 Removing a fan tray...
Page 103: ...8 15 Figure8 18 Securing the new power tray...
Page 131: ...11 7 Figure11 8 Routing AC power cords...