![H3C CR19000-20 Installation Manual Download Page 17](http://html1.mh-extra.com/html/h3c/cr19000-20/cr19000-20_installation-manual_3148432017.webp)
1-11
Figure1-4 Reserving enough clearance in front of the plywood box for placing a ramp
Unpacking and inspecting the router
WARNING!
The edges of standard tongues are sharp. To avoid bodily injury, wear protective gloves when
unpacking the router.
CAUTION:
•
If you find something damaged before powering on the router, keep the router as it is, take
photos, and keep the original packing materials, padding materials, and accessories.
•
When transporting, moving, and installing the router, be careful not to bump the router into the
door or wall.
IMPORTANT:
As a best practice, keep the packing materials for later moving or shipment.
To unpack and inspect the router:
1.
Prepare a screwdriver and other tools and wear protective gloves.
2.
Place the plywood box on the floor with the pallet at the bottom.
Summary of Contents for CR19000-20
Page 11: ...1 5 Figure1 1 Chassis dimensions...
Page 39: ...2 9 Figure2 7 Securing the router to the rack...
Page 61: ...4 2 Figure4 1 Slot arrangement...
Page 84: ...6 5 Figure6 4 Installing an air filter...
Page 97: ...8 9 Figure8 9 Removing a fan tray...
Page 103: ...8 15 Figure8 18 Securing the new power tray...
Page 131: ...11 7 Figure11 8 Routing AC power cords...