![H3C CR19000-20 Installation Manual Download Page 10](http://html1.mh-extra.com/html/h3c/cr19000-20/cr19000-20_installation-manual_3148432010.webp)
1-4
Space
IMPORTANT:
•
There is a minimum clear height of 3 m (9.84 ft) (from the beam or the air duct to the floor) in the
equipment room.
•
For easy installation and maintenance, reserve a minimum clearance of 1200 mm (47.24 in)
between the rack and walls or other devices.
Table1-2 Router dimensions and rack requirements
Model
Chassis dimensions
Rack requirements
CR19000-20
•
Height
—1820 mm (71.65 in)/41
RU
•
Width
—440 mm (17.32 in)
•
Depth
—980 mm (38.58 in)
Chassis
—850 mm (33.46 in)
Cable management
bracket
—90 mm (3.54 in)
Fan tray handle at the
rear
—40 mm (1.57 in)
As a best practice, use a rack that meets the
following requirements:
•
With dimensions (H × W × D) of 2200 ×
600 × 1200 mm (86.61 × 23.62 × 47.24 in)
•
180 mm (7.09 in) from the front rack posts
to the interior side of the front door when
the router is fully configured with
components and cables. You can reduce
the distance between the front rack posts
and the front door as required.
•
A minimum of 950 mm (37.40 in) from the
front rack posts to the interior side of the
rear door.
•
740 mm (29.13 in) from the front rack
posts to the rear rack posts.
Summary of Contents for CR19000-20
Page 11: ...1 5 Figure1 1 Chassis dimensions...
Page 39: ...2 9 Figure2 7 Securing the router to the rack...
Page 61: ...4 2 Figure4 1 Slot arrangement...
Page 84: ...6 5 Figure6 4 Installing an air filter...
Page 97: ...8 9 Figure8 9 Removing a fan tray...
Page 103: ...8 15 Figure8 18 Securing the new power tray...
Page 131: ...11 7 Figure11 8 Routing AC power cords...