2-2
Installation flowchart
Figure2-1 Installation flowchart
Start
Prepare for
installation
Rack-mount the router
Ground the router
Install cable
management brackets
Install power supplies
Install modules
Connect cables
Verify the installation
Check before and after
power-on
Troubleshoot the router
Power off the router
Operating
correctly?
Read safety
recommendations
Inspect the router
Examine the installation
site
Prepare installation tools
AC power supplies
DC power supplies
High-voltage DC power
supplies
Yes
No
End
Fabric modules
MPUs
Interface modules
Interface subcards
Summary of Contents for CR19000-20
Page 11: ...1 5 Figure1 1 Chassis dimensions...
Page 39: ...2 9 Figure2 7 Securing the router to the rack...
Page 61: ...4 2 Figure4 1 Slot arrangement...
Page 84: ...6 5 Figure6 4 Installing an air filter...
Page 97: ...8 9 Figure8 9 Removing a fan tray...
Page 103: ...8 15 Figure8 18 Securing the new power tray...
Page 131: ...11 7 Figure11 8 Routing AC power cords...