4-9
Figure4-9 Installing an ejector lever
7.
Open the ejector levers and continue to push the module by its middle part on the front panel
until you cannot push it any further.
8.
close the ejector levers until they come in close contact with the front
panel. Use a Phillips screwdriver to fasten the captive screws on the interface module.
Figure4-10 Closing an ejector lever
9.
As shown in
, press the spring tab on each ejector lever retainer to remove the
ejector levers. Place the ejector lever back on their holders and keep them secure for future
use.
Figure4-11 Removing an ejector lever
Installing an interface module that uses general ejector levers
1.
Wear an ESD wrist strap. Make sure the wrist strap makes good skin contact and is reliably
grounded.
2.
Remove the filler panel from the target interface module slot.
Keep the removed filler panel secure for future use.
3.
Open the ejector levers of the interface module. Gently push the interface module into the slot
along the guide rails.
4.
Continue to push the interface module by its middle part on the front panel until you cannot
push it any further. Then close the ejector levers.
1
2
Summary of Contents for CR19000-20
Page 11: ...1 5 Figure1 1 Chassis dimensions...
Page 39: ...2 9 Figure2 7 Securing the router to the rack...
Page 61: ...4 2 Figure4 1 Slot arrangement...
Page 84: ...6 5 Figure6 4 Installing an air filter...
Page 97: ...8 9 Figure8 9 Removing a fan tray...
Page 103: ...8 15 Figure8 18 Securing the new power tray...
Page 131: ...11 7 Figure11 8 Routing AC power cords...