28
Mount the operator housing after
all installation procedures are
complete. Slide operator housing
over legs, align holes, and use
screws provided to attach housing
to operator.
IMPORTANT: Hang the two (2)
GTO Warning Signs (provided) on
both sides of the gate before
operating. Make sure all warning
signs and labels are in place. Make
sure that the packet containing end
user safety instructions and
warranty procedures remains
attached to the operator housing
(as shown in the illustration).
A
TTACHING
T
HE
H
OUSING
IMPORTANT Safety Instructions