Chapter 6 Trial run
43
6.1 Check before trial run
①
Check wiring:
z
Ensure the wiring, especially the connections of the power supply wiring and motor
wiring of servo unit.
z
Ensure the earthing connection.
②
Check power supply to ensure the normal voltage.
③
Fix the servo motor securely against overturning or bumping.
④
Perform the dry run operation in trial run to make sure the normal running prior to loading
running.
Chapter 6 Trial run
Summary of Contents for DA98B
Page 1: ...GSK DA98B AC Servo Drive Unit User Manual ...
Page 2: ......
Page 9: ...Warning Ⅴ Notes ...
Page 10: ...GSK CNC Enquipment Co Ltd Ⅵ ...
Page 12: ...GSK CNC Enquipment Co Ltd 2 ...
Page 28: ...GSK CNC Equipment Co Ltd 16 Fig 3 4 Terminals and definition of CN1 ...
Page 78: ...GSK CNC Equipment Co Ltd 66 Fig 8 3 Outline and installation dimensions for BS 300 model ...
Page 79: ...Chapter 8 Isolated transformer 67 Fig 8 4 Outline and installation dimensions for BD 80 model ...
Page 80: ...GSK CNC Equipment Co Ltd 68 Fig 8 5 Outline and installation dimensions for BD 120 model ...
Page 87: ......