![GSI Group PNEG-1049 Assembly And Operation Manual Download Page 27](http://html1.mh-extra.com/html/gsi-group/pneg-1049/pneg-1049_assembly-and-operation-manual_2275205027.webp)
4. Assembly
PNEG-1049
10"-12" Commercial Bin Sweep Augers
27
34. Adjust the position of the bottom motor straps to provide adequate tension on the drive belts.
The belts should allow 1/64" of deflection for every 1" of center distance between the two (2) shafts.
35. Close the front of the belt guard. Attach the front to the back with the two (2) 5/16" x 3/4" hex bolts
and nylock nuts that were previously removed.
Figure 4Y Close Belt Guard
36. Route the power cord for the motor through the electrical cord support stand top ring and the
3/4" electrical clamp. Leave a small loop of electrical cord between the clamp and the electrical
junction box on the outside of the motor. Tighten the clamp to secure the cord.
Figure 4Z Electrical Cable Clamp
Summary of Contents for PNEG-1049
Page 40: ...40 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...
Page 42: ...8 Parts List 42 PNEG 1049 10 12 Commercial Bin Sweep Augers Motor Rods to Drive...
Page 44: ...8 Parts List 44 PNEG 1049 10 12 Commercial Bin Sweep Augers 10 12 Drive Assembly...
Page 46: ...8 Parts List 46 PNEG 1049 10 12 Commercial Bin Sweep Augers 3 1 Aluminum Enclosed Drive...
Page 54: ...54 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...