![GSI Group PNEG-1049 Assembly And Operation Manual Download Page 18](http://html1.mh-extra.com/html/gsi-group/pneg-1049/pneg-1049_assembly-and-operation-manual_2275205018.webp)
4. Assembly
18
PNEG-1049
10"-12" Commercial Bin Sweep Augers
8. Place the 2" O.D. x 11-1/2" connecting shaft into the free end of the flight. Once the holes are aligned
properly, attach the shaft to the flight using two (2) 5/8" x 4" grade 8 hex bolts and stover nuts.
Figure 4H Connecting Shaft to Flight
9. Place the bearing stand assembly onto the connecting shaft.
Figure 4I Bearing on Connecting Shaft
Summary of Contents for PNEG-1049
Page 40: ...40 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...
Page 42: ...8 Parts List 42 PNEG 1049 10 12 Commercial Bin Sweep Augers Motor Rods to Drive...
Page 44: ...8 Parts List 44 PNEG 1049 10 12 Commercial Bin Sweep Augers 10 12 Drive Assembly...
Page 46: ...8 Parts List 46 PNEG 1049 10 12 Commercial Bin Sweep Augers 3 1 Aluminum Enclosed Drive...
Page 54: ...54 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...