![GSI Group PNEG-1049 Assembly And Operation Manual Download Page 15](http://html1.mh-extra.com/html/gsi-group/pneg-1049/pneg-1049_assembly-and-operation-manual_2275205015.webp)
4. Assembly
PNEG-1049
10"-12" Commercial Bin Sweep Augers
15
3. Thread one 3/4" hex nut onto each post of the bottom motor straps. Next, place the front bottom motor
strap through the belt guard mounting strap and the front hole of the motor mount frame assembly.
Place the back bottom motor strap thought the back hole of the motor mount frame assembly. Retain
the straps by threading one 3/4" hex nut onto each post. DO NOT TIGHTEN the nuts at this time.
They will need adjustment when the motor is installed.
Figure 4C Attach Bottom Motor Mount Strap
4. Place the motor rods into the indentations on the bottom motor straps. Secure the motor rods in place
by bolting the top motor straps to the bottom motor straps using eight (8) 3/8" x 1-1/2" grade 8 hex
bolts, sixteen (16) flat washers and eight (8) nylock nuts. DO NOT TIGHTEN the nuts at this time.
They will need adjustment when the motor is installed.
Figure 4D Attach Motor Rod and Top Motor Strap
Summary of Contents for PNEG-1049
Page 40: ...40 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...
Page 42: ...8 Parts List 42 PNEG 1049 10 12 Commercial Bin Sweep Augers Motor Rods to Drive...
Page 44: ...8 Parts List 44 PNEG 1049 10 12 Commercial Bin Sweep Augers 10 12 Drive Assembly...
Page 46: ...8 Parts List 46 PNEG 1049 10 12 Commercial Bin Sweep Augers 3 1 Aluminum Enclosed Drive...
Page 54: ...54 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...