background image

Water Softener

 

Weichwassermeister

®

 GSX 5, GSX 10, GSX 10-I

 
 

Order no.-Nr. 075 187 970-inter   Edited by: KONS-nkes-mrie G:\BA-187970-INTER_GSX 5-10.DOC 

 

 

 

EC Declaration of Conformity 

This is to certify that the system designated below meets the safety and health requirements of the 
applicable European guidelines in terms of its design, construction and execution. 

If the system is modified in a way not approved by us, this certificate is void. 

Manufacturer: 

Grünbeck Wasseraufbereitung GmbH 
Industriestrasse 1 
89420 Hoechstaedt/Germany 

Responsible for documentation: 

Markus Pöpperl 

System designation: 

Weichwassermeister

®

 

System type: 

GSX 5, GSX 10, GSX 10-I 

System number: 

Refer to type designation plate 

Applicable EC guidelines: 

EC Guideline EMV (2004/108/EC 
EC Low Voltage Guideline (2006/95/EC) 

Applied harmonized standards, in 
particular: 
 

DIN EN 61000-6-2, DIN EN 61000-6-3, 
1

st

 Guideline on Device and Product Safety 

(Ordinance on the Marketing of Electrical Operating Materials 
to be used within specific voltage limits – 1. GPSGV). 

Applied national standards and tech-
nical specifications, in particular: 

DIN 1988; DIN 19636-100; DIN EN 14743 
DIN 31000/VDE 1000 (03.79)

Date/Signature of  
manufacturer: 

19.03.10 i. 

V. 

___ 

 

Markus Pöpperl 

 

Dipl. Ing. (FH)

 

Function of signatory: 

Head of Engineering Department for Serial Products

 

Summary of Contents for Weichwassermeister GSX 10

Page 1: ...Operation Manual Water Softener Weichwassermeister GSX 5 GSX 10 GSX 10 I Edition November 2011 Order no 075 187 970 inter...

Page 2: ...late 2 System components 3 Technical specifications 4 Designated application 5 Application limits 6 Scope of supply D Installation 21 1 General installation instructions 2 Preliminary works 3 How to c...

Page 3: ...egard to technical progress Reprints translations into foreign languages electronic storage or copying only with written approval of Gr nbeck Wasseraufbereitung GmbH Any type of duplication not author...

Page 4: ...mentation Markus P pperl System designation Weichwassermeister System type GSX 5 GSX 10 GSX 10 I System number Refer to type designation plate Applicable EC guidelines EC Guideline EMV 2004 108 EC EC...

Page 5: ...ls This ensures reliable operation over many years provided you treat the systems with the required care This operation manual assists you with important information Therefore read the complete manual...

Page 6: ...ther manufacturers and if the quality and composition of such dosing agents or chemicals is be yond Gr nbeck s control Gr nbeck shall not be liable for defects or damage resulting from inept handling...

Page 7: ...be performed by Gr nbeck s technical service or by persons expressly authorized by Gr nbeck Tasks with this symbol may only be performed by personnel instructed in electrical engineering according to...

Page 8: ...o health due to contaminated drinking water The sys tem may only be installed by a qualified company The operation manu al must be strictly adhered to Ensure that there is sufficient flow The pertinen...

Page 9: ...t only approved companies are permitted to make major modifications to water treatment facilities and that at regular intervals tests inspections and maintenance are to be performed on the devices ins...

Page 10: ...side by side e g in the mineral dolomite Hardness ranges according to German Detergent and Cleaning Agents Act WMRG Hardness range dH f mmol l mol m3 1 soft 0 8 4 15 0 0 1 5 2 medium 8 4 14 15 0 25 0...

Page 11: ...inues until the sodium ions are used up Fig B 2 Operation The exchange reaction can be reversed if a large amount of sodium ions salt solution brine is added fig B 3 By their sheer number they re plac...

Page 12: ...SX Serial number Order number Nenndur ch uss 20 8 dH Nominal flow 20 8 dH D bit nominal 20 8 dH Netzanschluss Mains supply Branchement lectrique 85 265V 50 60Hz 17VA Zul W assertemperatur Admissible w...

Page 13: ...oam adapter only for GSX 5 3 Locking screw of blending valve 11 Sieve bottom 19 Exchanger 4 Shut off valve for soft water 12 Protective pipe with interior brine valve 20 Power cable 5 Connection block...

Page 14: ...s a forced regeneration as per DIN 19636 100 Raw water is used to regenerate the system All system data is shown in table C 1 The information applies to the standard version of the system Different da...

Page 15: ...mm 485 B Height of water softener mm 730 C Depth of water softener mm 535 D Height of safety overflow of brine tank mm 530 E Connection height of control valve soft water mm 440 F Connection height o...

Page 16: ...softener is adapted to the soft water requirements to be ex pected at the installation site It is not suitable for considerably differing performances The nominal flow must not be exceeded In case of...

Page 17: ...SX 10 I has to be used A nominal flow which is defined at 750 l h in combination with a higher salt requirement for the regeneration guar antee a hardness of 0 1 dH 0 2 f 0 02 mmol l throughout the en...

Page 18: ...for details Electronically controlled dosing unit for corrosion protection in connec tion with the Weichwassermeister GSX The unit is activated by means of the standard interface EXAcount without add...

Page 19: ...output analogue output and relay contact to Gr nbeck control unit Dimensions 160 x 240 x 160 mm M bus measuring transducer D DAM complete 115 850 Extension kit for connection hose to extend the length...

Page 20: ...s Seals and control disks are subject to a certain wear and tear Wearing parts are indicated below Note Although these parts are considered to be wearing parts we grant a limited warranty period of 6...

Page 21: ...ctions The installation site must provide adequate space A foundation of a sufficient size and load carrying capacity must be provided The required connections must be provided prior to the installati...

Page 22: ...oftener must be preceded by a drinking water filter e g BOXER KD incl pressure reducer and if necessary by a pressure re ducer Recommended pressure 4 bar If the process e g reverse osmosis system esta...

Page 23: ...Pressure relief safety valves therefore must be installed downstream of the connection block 1 2 Electrical installation An earthed socket is required for the electrical connection It must cor respon...

Page 24: ...drain Make sure there is a free outlet min 20 mm to the drain Fasten the hose with appropriate means in order to prevent the hose from wag ging emerging regeneration water is under pressure Fig D 3 D...

Page 25: ...230 V 1 A Fig D 5 item 1 as well as a programmable input for connection to a voltage free contact Fig D 5 item 2 For a detailed description of the available functions refer to chapter F paragraph 3 2...

Page 26: ...rts We recommend having Gr nbeck s technical service authorised service company start up the system Note The salt level in the brine tank must always be higher than the brine level Please observe the...

Page 27: ...he water softener 1 Open the shut off valve for raw water at the connection block 2 Visually check for tightness check at the connection block as well 3 Plug in mains plug 4 Set the control unit Set t...

Page 28: ...form 0 dH 0 f 0 mmol l test Unscrew the locking screw at the blending valve and close the blending valve at the connection block completely turn to the right Withdraw a water sample downstream of the...

Page 29: ...te the soft wa ter hardness Withdraw a water sample at the closest tap and determine the soft water hardness Soft water hardness too low Turn the blending valve a little further to the left open Soft...

Page 30: ...acc to Ger Drinking Water Regulations x mg l sodium concentration in raw water y mg l permissible dosing of sodium during softening y 8 2 Z dH max possible softening The raw water may be softened by...

Page 31: ...r GSX are volume and or timer controlled They are operated and monitored by means of the control unit Fig F 1 Operating panel of Weichwassermeister GSX green LED Water softener is working properly yel...

Page 32: ...ng to save and close parameter numerical display stops blinking 2 In standard operation to release a manual regeneration press for 5 sec On the User Programming level to return to the previous paramet...

Page 33: ...of the current value in the numerical display 8 The symbolic drop is blinking when water is withdrawn 9 In standard operation The exchanger and its residual capacity is indicated The respective seg me...

Page 34: ...generation process if activated Depending on the regeneration step the corresponding arrow will ap pear Brine is sucked from the brine tank Water is filled into the brine tank 10 e Reference run regen...

Page 35: ...5 Press key to access the next menu item The display indicates the minutes 6 Press key The displayed minutes start blinking 7 Set current time minutes In order to do so Decrease the minutes by means...

Page 36: ...to return to the basic dis play The display indicates Ibn After approx 10 minutes the current time will be displayed and both exchanger tanks will be regenerated 2 3 Info level The display indicates t...

Page 37: ...ed in operating mode b 1 regeneration exclusively via daily interval and time and the maximum soft water volume is reached prior to the set regeneration interval has expired the water softener is rest...

Page 38: ...erts as incorrectly set values may result in the overrunning of the exchangers or in malfunctions 3 1 Installer level 290 Prerequisite The control unit indicates the standard display time 1 Press and...

Page 39: ...0300 is displayed CA72 0300 CA73 0300 4 Home in on ref erence position of transfer valve 0 0 1 Started by reprogramming to the value 1 An ongoing regeneration is aborted by this Attention Modificatio...

Page 40: ...ller Programming level is active Initially the required menu has to be chosen The figures are blinking They have to be modi fied so that they indicate the Code for the menu to be processed The Code fo...

Page 41: ...regeneration process 4 contact closed in case of a flow rate of 0 m h or in case of transfer 1 Delay time for SA 4 min 1 0 0 1 9 9 Contact only reopens time delayed when the transfer has been complete...

Page 42: ...their elimination The GSX water softeners are equipped with an error detection and signal system If an error message is displayed 1 Press key acknowledgement of malfunction does not apply to symbol r...

Page 43: ...factory setting Er 1 Step monitoring at regenera tion motor Acknowledge malfunction home in on the ref erence position refer to table F 3 item 5 Notify Gr nbeck s technical service authorised service...

Page 44: ...er to chapter F 3 1 Readjust the correct data record CA71 CA73 parameter index 1 1 Factory setting deactivated can be activated by Gr nbeck s technical service authorised service company if required 3...

Page 45: ...ctor sieve Dismantle brine valve and thoroughly clean it No salt in brine tank Refill salt Salt clumps together Loosen up clumped salt with suitable tool so that loose salt is available again in brine...

Page 46: ...nspection every second months Yearly maintenance For documentation of the maintenance work an operation log refer to chapter H paragraph 4 must be kept Note By concluding a maintenance contract you en...

Page 47: ...level in the brine tank respect the minimum salt filling level refer to marking line at brine tank funnel If necessary refill salt tablets Check salt quality salt must not be clumped together If nece...

Page 48: ...drive motors of control valve clean in jector and sieve Clean brine tank and brine valve Check regeneration salt supply volume and quality no clumping Check hose connections and seals and replace if n...

Page 49: ...Installed by Customer service technician Company Work time certificate no Signature Filter Make type Drain connection DIN EN 1717 yes no Floor drain available yes no Water stop yes no Pumping system y...

Page 50: ...Water Softener Weichwassermeister GSX 5 GSX 10 GSX 10 I Order no Nr 075 187 970 inter Edited by KONS nkes mrie G BA 187970 INTER_GSX 5 10 DOC 50...

Page 51: ...Injector cleaned Injector sieve cleaned Injector sieve cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell replaced Carbon el...

Page 52: ...d Injector cleaned Injector sieve cleaned Injector sieve cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell replaced Carbon e...

Page 53: ...Injector cleaned Injector sieve cleaned Injector sieve cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell replaced Carbon el...

Page 54: ...ed Injector cleaned Injector sieve cleaned Injector sieve cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell replaced Carbon...

Page 55: ...Injector cleaned Injector sieve cleaned Injector sieve cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell replaced Carbon el...

Page 56: ...ed Injector cleaned Injector sieve cleaned Injector sieve cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell cleaned Carbon electrode of chlorine cell replaced Carbon...

Page 57: ...hwassermeister GSX 5 GSX 10 GSX 10 I Order no 075 187 970 inter Edited by KONS nkes mrie G BA 187970 INTER_GSX 5 10 DOC 57 Farbkennzeichnungen Schaltplan auf Seite 34 ws wt gn gn bn bn rs pi ge ye gr...

Reviews: