![Gruetzner LUB-V User Manual Download Page 60](http://html1.mh-extra.com/html/gruetzner/lub-v/lub-v_user-manual_2270801060.webp)
60
4. Mount new lubricant cartridge
l
Place the full lubricant cartridge onto
LUB-V (label facing front).
l
Turn the lubricant cartridge clockwise onto
LUB-V.
The end position is reached after two full
rotations when the label of the lubricant car-
tridge is aligned with the front label of LUB-V.
5. Assemble housing on power unit
l
Place the dismantled housing on LUB-V
and press it onto the power unit.
l
Fasten the housing to the power unit by
turning the retaining ring clockwise.
The retaining ring must snap into place
when turning and be completely tightened.