3
Revision date: 04.17.20
2-Layer Film Install
Important Information
REQUIRED TOOLS
The following list identifies the main tools needed. Additional tools and
supports may be needed depending on structure and location.
• Tape measure and marker; hammers and gloves.
• Clutched drill driver to drive Tek screws. (Cordless with extra batteries
works best.)
Do not use an impact driver to install Tek screws.
• Scissors (or utility knife); tin snips or wire cutters for wire spring.
• 1/4" or 5/16" drill bit; 1-3/8" hole saw bit.
• Hand tools; saw or grinder to cut aluminum flashing. Clamps to install
u-channel flashing.
• Ladders, work platforms, and other machinery for lifting designed to work
safely at building height. Rope for cover installation.
ASSEMBLY NOTE:
Install Tek screws using a clutched drill driver
running approximately 750 RPM while applying approximately 50
lbs of force.
Do not use an impact driver to install Tek screws!
PARTS
102198A U-Channel Spring
102197 Aluminum
U-Channel
FA4482B Tek Screw
108553 Truss Head Screw
FAH008B (or FAH009B) & FALB01B
Carriage Bolt & Hex Nut
FA4650 or FA4652
Wood Screws