GROWSPAN
™
ROUND PREMIUM GREENHOUSES
30
106201_02_03_04
Revision date: 01.10.19
INSTALL OVERLAP BRACING AND U-CHANNEL
View from
outside.
Upper Panel
Lower Panel
Install 8' aluminum
profile here along edge
of upper panel.
Upper
Panel
Aluminum profile attached
to bottom of upper panel
(outside of frame).
Lower Panel
Foil tape at top of lower panel.
Complete this procedure to finish panel installation:
1.
Install 8' sections of aluminum profile (104213) along
lower edge of all upper panels on both sides. Trim last
section to length as needed.
NOTE:
Install long side of
profile on top of panel.
Do not use Tek screws or
washers when installing
aluminum U-channel at this
time.
Solid line shows end
of all upper panels.
Dashed line shows
top of all lower panels
(inside greenhouse).
104213 U-Channel
Long Side
of Profile
2. Move inside the frame and measure between rafters at
point where upper and lower panels overlap.
3.
Cut a piece of 104779 (1.5" x 1.5") square tubing to fit
between rafters. (All tubes should be same length.)
NOTE:
Diagram (above) shows where to measure to
determine length of 1.5" x 1.5" tube. Diagram shows
installed panels as seen standing inside greenhouse.
4. From inside the frame, align square tube as shown
over lower end of upper panel (dashed line). Hold tube
in place tight against panel.
1.5" x1.5" Tube
View from inside the shelter.
Foil tape at top of lower panel.
ATTENTION:
Align
and install tube as
shown to secure
upper and lower
panels together at
overlap seam.
View shows
underside of panels
as seen from inside
greenhouse.
Foil Tape
(top of
lower
panel
inside)
Lower
Panel
104779 Tube
(inside the
greenhouse)
U-Channel
(bottom of
upper panel –
outside)