GROWSPAN
™
ROUND PREMIUM GREENHOUSES
16
106201_02_03_04
Revision date: 01.10.19
INSTALL THE END WALL FRAME (continued)
24. Tighten band clamp and
install a short Tek screw
through backside of clamp and into rafter.
25. Repeat procedure as needed to assemble and install
the remaining vertical end wall supports.
Inside view
of end rafter
DOOR INSTALLATION
Install door between door jambs. The following steps
describe one way to install door.
1. Move to bottom of door jamb and swing tube outward
as shown below.
ATTENTION:
If tube is attached to base rail, remove
Tek screws and continue.
2. With proper assistance, lift door and position it in the
opening.
3. With door held in place, swing loose door jamb back
into position. Secure jamb to base rail using Tek
screws.
4. Choose square tube for door header and cut swaged
end to proper width of rough door opening.
ATTENTION:
Frame of door is designed to "wrap
around" the door jambs. Diagram below shows how
door is installed.
Width of Door Frame
QH1330 Angle
Brackets
5. Attach two (2) (QH1330) angle brackets to header
using Tek screws. Verify brackets are flush with tube
ends.
Frame of Supplied Door
TOP VIEW OF DOOR
Door
Jamb
Door
Jamb
Door Jamb
ATTENTION:
Door jambs sit within frame channel
door. Header tube will sit on top of installed door.