GROWSPAN
™
ROUND PREMIUM GREENHOUSES
10
106201_02_03_04
Revision date: 01.10.19
INTERIOR RAFTER ASSEMBLY
Complete the following steps
for the interior rafters
.
1.
Select the pipes for the first interior rafter assembly and
position these on the ground as shown.
IMPORTANT:
Interior rafters do not use end clamps.
Instead, cross connectors are attached during the
frame assembly.
2. Insert the swaged ends of the rafter pipes into the plain
ends of the pipes and secure each joint with a Tek
screw.
NOTE:
For longer frames, it may be easier to assemble
a few rafters at a time and then begin to assemble the
frame.
3. Once rafters are assembled, assemble the frame.
RAFTER ASSEMBLY (CONTINUED)
ASSEMBLE FRAME
Gather parts:
• All rafter assemblies and cross connectors (102479)
• Purlin pipe 1.315'' x 75'' swaged (131S075)
• Purlin pipe 1.315'' x XX'' plain (131P0XX)
• 5/16" x 2-1/2" machine bolts and 5/16" nuts
• Tek screws (FA4482B)
• Marker and tape measure
• Lifts, ladders, and assistants
• Rope or cable to temporarily brace rafters
NOTE:
The purlins run perpendicular to rafter assemblies.
Each purlin consists of 1.315" x 75" (131S075) swaged
pipes (number is determined by shelter length) and one (1)
1.315" x XX" (131P0XX) plain pipe. Consult Side Profile
drawings for XX part identification.
Complete these steps to assemble frame.
1. Carefully stand
first end rafter
and place leg pipes in
first set of ground posts.
Verify nuts and bolts of end
clamps are to the inside of the frame.
Inside of
Shelter
Outside of
Shelter
Rafter
Ground
Post
5/16" x 2-1/2"
machine bolt
and 5/16" nut
2. Secure leg pipes to ground posts using 5/16" x 2-1/2"
machine bolts and nuts.
Toward inside the
greenhouse.
Purlin
End Rafter
(#14R1301D)
(#14R1302)
(#14R1303)