GROWSPAN
™
ROUND PREMIUM GREENHOUSES
20
106201_02_03_04
Revision date: 01.10.19
END PANEL INSTALLATION (continued)
ATTENTION:
Space screws and washers at 16" on-
center. Install 104213 u-channel along bottom of panels.
15. Cut panel(s) to proper height after attaching to frame.
ATTENTION:
In above photo, top of panel is
removed using a power tool equipped with a round
cutting bit.
Greenhouse in photo used for illustration only. It is of a
different model.
Review flashing installation steps later in this guide to
determine length. Panel to remain flush with top of end
rafter pipe.
Flashing, installed in the next procedure, will cover tops
of all end panels. See dashed line in previous diagram.
16. Apply DH8007 foil tape to the tops of all end panels
to seal all open cells before flashing installation. See
dashed line in previous diagram.
17. Standing outside the door, install Tek screws through
door frame and into end wall frame member to secure.
18. Repeat procedures (as needed) to install remaining
end panels for other end of greenhouse.
NOTE:
Consult Quick Start section for additional
information and panel identification for back (no door)
end wall
19. Continue with
Gable Flashing Installation
procedures
on next pages.
Cut upper panel
to proper length.
Tek screw
14. Place panel in position with its UV-protected surface to
the outside and attach to end wall framing.
U-Profile attached to panel
along door edge.
6' x 10'
6' x 10'