4.5.3 Remove the power cord
PC
S
Press
Press
Upwards
Fig 4.11: Remove the power cord
Power on and off the Battery 5
5.1 Power On
WARNING
Ø
The installation and use of batteries involve much specialized
knowledge. Therefore, technicians should be given appropriate
technical training and obtain operational certificates in compliance
with local laws and regulations. Please ensure technicians have
obtained training certificate before operation/ L'installation et
l'utilisation des batteries impliquent des connaissances très
spécialisées. Par conséquent, les techniciens doivent recevoir une
formation technique appropriée et obtenir des certificats opérationnels
conformément aux lois et réglementations locales. Veuillez vous assurer
que les techniciens ont obtenu un certificat de formation avant
l'utilisation.
Ø
Please stand on dry insulating objects and do not wear conductive
material such as watches and necklace during operation. Insulated
tools should be used/ Veuillez vous tenir sur des objets isolants secs et
ne pas porter de matériaux conducteurs tels que des montres et des
colliers pendant le fonctionnement. Des outils isolés doivent être
utilisés.
Ø
Do not contact any positions with potential difference/ Ne contactez
aucune position avec une différence de potentiel.
Ø
Prohibition sign should be hung on the battery: " Non -
professionals, do not touch"/ Un panneau d'interdiction doit être
accroché sur la batterie : " Non - professionnels, ne pas toucher ".
Ø
If any abnormalities occur during the startup phase, power off the
PACK immediately. After problem confirmed, proceed again/ Si des
anomalies surviennent pendant la phase de démarrage, mettez
immédiatement le PACK hors tension. Une fois le problème confirmé,
recommencez.ACK immediately. After problem confirmed, proceed
again.
Ø
Make sure the inverter is turned off before checking the PACK/
Assurez-vous que l'onduleur est éteint avant de vérifier le PACK.
15
16
Step 1: Remove the security screw
Step 2: Press the buttons on both sides of the terminal at the same time, and then pull it
out forcefully
When multiple batteries are connected in parallel or multiple clusters of batteries are
connected in parallel, press one of the battery power buttons and all the batteries
connected in parallel can be turned on.
WARNING
Avertissemen
Power on the PACK by pressing power button(t>2S)
Serial
Procedures
Acceptation criteria
1
Connect the battery and PCS
Make sure the wiring harnesses are well
connected
2
Close the breaker of the PACK
Make sure the breaker is ON
3
Press POWER button for three to
five seconds. Observe the LED
indication on panel.
1. If both RUN/ALM and SOC lights turn on
normally, PACK is powered on successfully.
2. If RUN/ALM light turns red, there is a failure
and should solve it before power on again.
4.6 About mixing old and new batteries in parallel
Please ensure batteries in parallel connection are from the same batch, same model
and same manufacturer. Do not mix an old battery with a new battery. Batteries
undergone less than 300 cycles are defined as new batteries.The installation time of
the newly added battery and the installed battery is less than or equal to 1 year, and
the newly added battery must be within the shelf life of 6 months.