ARK 5.0 L Cable
C
(2000
±
25)mm
RJ 45 dust cover
USB dust cover
9
10
Do not turn the PACK upside down, and keep the ground
level/ Ne retournez pas le PACK et maintenez le niveau du
sol.
WARNING/Avertissemen
4.3 Installation Required Tools
The following tools are required to install the PACK:
5mm Allen key
Screw Driver
Wrench
Tap Measure
Multimeter
Ground(2
~
8 clusters installation)
1
5
0
m
m
≤
d
≤
5
0
0
m
m
. . .
Cluster 1
Cluster 2
Cluster 8
1
5
0
m
m
≤
d
≤
5
0
0
m
m
Cluster 3
Fig 4.2: Acceptable floor standing installation
It is recommended to wear the following safety gear when dealing with the PACK.
Insulated Glove
Safety Goggle
Safety Shoes
4.4 Check
Check the package Check the PACK package before open it. If any abnormity is
detected, do not open the Package and contact your distributor.
Check the power
Check and confirm the PACK is powered off before installation.
Check deliverable
Check the quantity of all parts inside according to the package list.
If there is any part missing or damaged, please contact your
distributor.
Fig 4.3: AXE 5.0L packing list
4.4.1 Pre-installation Check
4.4.2 Check Packing List
4.4.3 Check accessories
A
ARK 5.0 L
Ground
Ground
≥
150mm
≥
150mm
90
°
Wall
90
°
4.2 Basic installation requirements
Fig 4.4: Parts list
AXE 5.0L *1
Quick installation Manual *1
User Manual *1
Quick
installation
Manual
Warranty card *1
Certificate of conformity *1
Warranty
card
Certificate o
f
conformity
User Manual
ARK 5.0 L Base(Any of them)
B