background image

Shenzhen Growatt New Energy Co., Ltd

4-13/F,Building A,Sino-German(Europe) Industrial Park,Hangcheng Ave,

Guxing Community,Xixiang Subdistrict, Bao’an District, Shenzhen, China

 +86 755 2747 1942

www.ginverter.com

T
E

W

[email protected]

Download
Manual

Growatt New Energy

   Residential Energy Storage User Manual

                    

                         AXE 5.0L Battery System

  

                       

GR-UM-275-A-01

Summary of Contents for AXE 5.0L-C1

Page 1: ...ndustrial Park Hangcheng Ave Guxing Community Xixiang Subdistrict Bao an District Shenzhen China 86 755 2747 1942 www ginverter com T E W service ginverter com Download Manual Growatt New Energy Resid...

Page 2: ...es the installation electrical connection operation commission maintenance and troubleshooting of AXE 5 0L C1and AXE 5 0L X1 Battery System hereafter simply put AXE 5 0L Before installing and operatin...

Page 3: ...to 8 clusters in parallel to expand the capacity and power of the energy storage system The whole battery system communicates to Power Conversion System PCS via CAN Monitoring voltage current and tem...

Page 4: ...ts such as wires Do not dispose the batteries in fire which may cause an explosion The PACK shall not come in contact with liquids The PACK can only be installed indoors Regarding indoor installation...

Page 5: ...er frapper planter un clou ou pi tiner le PACK Cela peut provoquer un d gagement de chaleur une explosion ou un incendie En cas de fuite d lectrolyte ne pas mettre l lectrolyte en contact avec les yeu...

Page 6: ...allation environment requirements Max 50 Min 0 Indoor installation 7 8 Avertissement 3 1 Storage Requirements Place the PACK follow the identification on the packing case during storage Do not put the...

Page 7: ...Shoes 4 4 Check Check the package Check the PACK package before open it If any abnormity is detected do not open the Package and contact your distributor Check the power Check and confirm the PACK is...

Page 8: ...n parall le 4 Please install indoors and ensure the level of the ground Veuillez installer l int rieur et assurer le niveau du sol Fig 4 5 Multiple AXE 5 0L with base installation process 4 5 2 Electr...

Page 9: ...y cluster 4 5 2 3 Multi cluster wiring CAN communication Power Power PE To PCS Cluster 1 Cluster 2 Cluster 3 Cluster 8 Fig 4 9 Block diagram of multi cluster system PCS Link in Link out PCS Link in Li...

Page 10: ...er off the PACK immediately After problem confirmed proceed again Si des anomalies surviennent pendant la phase de d marrage mettez imm diatement le PACK hors tension Une fois le probl me confirm reco...

Page 11: ...e Suggested actions ALM ALM Light Flickers Discharge under voltage protection Single cell voltage below the threshold for under voltage protection There is over discharge risk User should stop dischar...

Page 12: ...5 0L C1 X1 AXE 10 0L C1 X1 3 Nominal Capacity Energy 100Ah 5 0kWh 200Ah 10 0kWh 4 Rated Capacity Energy 90Ah 4 6kWh 180Ah 9 2kWh 5 Rated Voltage 51 2V 6 Operating Voltage 46 4 57 6V 7 Rated Charging...

Page 13: ...1P16S 3P M 0 50 90 IFpP 51 161 119 1P16S 4P M 0 50 90 26 Multiple clusters in parallel Max 8 Clusters No Items Specification 1 Parallel number of Battery systems 5 6 2 Battery Model AXE 25 0L C1 X1 A...

Page 14: ...P16S 7P M 0 50 90 IFpP 51 161 119 1P16S 8P M 0 50 90 26 Multiple clusters in parallel Max 8 Clusters No Items Specification 1 Parallel number of Battery systems 9 10 2 Battery Model AXE 45 0L C1 X1 AX...

Page 15: ...arge and over discharge alarm t 1S RUN ALM light flicker green Over charge and over discharge protection t 1S RUN ALM light flicker green Charging current limit does not respond t 1S RUN ALM light fli...

Page 16: ...er red External CAN communicat ion failure t 1S RUN ALM light flicker red Interior CAN communicat ion failure t 1S RUN ALM light flicker red Parallel connection failure t 1S RUN ALM light flicker red...

Reviews: