background image

STOP!

STOP!

16770-

CB

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

 1-888-827-9056 

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Summary of Contents for GABLE

Page 1: ...ly or product information call our toll free number 1 888 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST ...

Page 2: ... This page intentionally left blank ...

Page 3: ...TRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to le...

Page 4: ... the assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Cau...

Page 5: ...2 cm x6 x4 x4 2 x 3 x 69 5 x 7 6 x 175 3 cm OV x4 2 x 3 x 77 5 x 7 6 x 196 cm PB x2 2 x 3 x 92 5 8 5 x 7 6 x 235 3 cm PM x2 2 x 3 x 94 1 2 5 x 7 6 x 240 cm PR 2 x 4 x 65 7 8 5 x 10 x 167 cm x6 x4 x4 CV 5 8 x 4 x 14 1 6 x 10 x 35 6 cm x8 WNA 2 x 3 x 58 5 x 7 6 x 147 3 cm x4 CDD 1 x 3 x 94 3 4 2 5 x 7 6 x 240 1 cm x2 x2 x2 HS 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm x2 NH 2 x 3 x 48 5 x 7 6 x 122 cm x2 x2 ...

Page 6: ... x 72 1 x 122 x 183 cm x1 x1 x1 x1 x1 RIGHT DOOR x1 LEFT DOOR x1 RIGHT x1 LEFT NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail must match screw length 4 DOOR HARDWARE Not Actual Size 3 4 19 mm 3 4 19 mm 3 4 19 mm 64 Metal Threshold Bagged seperately special coating x1 x4 x1 x1 x7 x11 Roof panels are 7 16 11 mm thick x2 x2 19 x 96 48 x 2...

Page 7: ...1 mm thick x2 x2 x4 x2 x2 x2 x2 x2 x2 x4 19 x 96 48 x 244 cm 19 x 48 48 x 122 cm 19 x 48 48 x 122 cm 19 x 96 48 x 244 cm 19 x 96 48 x 244 cm 48 x 96 122 x 244 cm 48 x 96 122 x 244 cm 48 x 96 122 x 244 cm 48 x 48 122 x 122 cm 48 x 48 122 x 122 cm 2 5 0 cm x1 1 lb of 2 5 0 cm 2 5 0 cm 2 5 0 cm x2 x2 1 lb of 2 5 0 cm 1 lb of 2 5 0 cm ...

Page 8: ...e acrylic latex exterior caulk that is paintable FOUNDATION OR FLOOR MATERIALS Your shed kit does not include a wood floor frame or floor panel materials See page 8 for the additional oor panel sizes and quantities required This shed does not include any leveling materials See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your oor as this w...

Page 9: ...l code for concrete foundation requirements 120 305 cm 120 305 cm 120 305 cm 85 5 8 217 cm 133 5 8 339 cm 181 5 8 461 cm 10 x 7 8 5 8 305 x 235 cm 10 x 11 8 5 8 305 x 357 cm 10 x 15 8 5 8 305 x 479 cm 10 x 8 305 x 244 cm 10 x 12 305 x 366 cm 10 x 16 305 x 488 cm 92 5 8 235 cm 151 1 2 385 cm 140 5 8 357 cm 185 470 cm 188 5 8 479 cm 224 568 cm Treated Sill Plate Caulk between sill plate and concrete...

Page 10: ...x 12 10 x 16 10 x 16 8 2 5 0 cm x1 x1 1 lb of 2 5 0 cm Hot Dipped Galvanized Box Type Nails 1 lb of 3 7 8 cm Hot Dipped Galvanized Deck Type Nails FLOOR PANELS Not Included You may need floor panels and nails to complete your floor Floor panel sizes and quantities are shown below Use a minimum of 5 8 1 6 cm Oriented Strand Board OSB 5 8 x 23 7 8 x 92 5 8 1 6 x 60 6 x 235 3 cm 5 8 x 23 7 8 x48 1 6 ...

Page 11: ...10 x 10 x 305 cm Treated Lumber x4 10 x 12 4 x 4 x 10 10 x 10 x 305 cm Treated Lumber x5 10 x 16 4 x 4 x 10 10 x 10 x 305 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 12 for each runner 3 screws exterior grade Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recomm...

Page 12: ...d Wood 2 x 4 x 89 1 2 5 x 10 x 227 cm Treated Wood 2 x 4 x 48 5 x 10 x 122 cm Treated Wood Center on marks Center on marks 120 305 cm 48 122 cm 48 122 cm 24 61 cm 72 183 cm 96 244 cm Offset Seam Offset Seam Flush at ends BEGIN 2 1 D O O R You have finished your 10 x 8 floor frame If building 10 x 8 kit go to page 13 If building 10 x 12 kit go to page 11 If building 10 x 16 kit go to page 12 FINISH...

Page 13: ...oor section 1 PARTS REQUIRED Flush at ends Center on marks 45 114 3 cm 48 122 cm 48 122 cm 1 1 2 3 8 cm 120 305 cm 48 122 cm 48 122 cm 24 61 cm 72 183 cm 96 244 cm 72 183 cm x2 x28 x2 x6 10 x 12 FLOOR FRAME Not Included BEGIN You will build two floor sections Offset Seam 2 x 4 x 45 5 x 10 x 114 3 cm 2 x 4 x 48 5 x 10 x 122 cm 2 x 4 x 72 5 x 10 x 183 cm Offset Seam Toenailing HINT For easier nailin...

Page 14: ...oor section 1 PARTS REQUIRED x2 x28 x2 x6 10 x 16 FLOOR FRAME Not Included BEGIN You will build two floor sections 2 x 4 x 93 5 x 10 x 236 2 cm 2 x 4 x 48 5 x 10 x 122 cm 2 x 4 x 72 5 x 10 x 183 cm Offset Seam HINT For easier nailing stand on frame Section 2 Section 1 Flush at ends Center on marks 93 236 2 cm 96 244 cm 48 122 cm 1 1 2 3 8 cm 120 305 cm 48 122 cm 48 122 cm 24 61 cm 72 183 cm 96 244...

Page 15: ... diagonal measurement will be approximately 151 1 2 385 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame at each point...

Page 16: ...easurements are the same the frame is square The diagonal measurement will be approximately 185 470 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is lev...

Page 17: ... diagonal measurement will be approximately 224 568 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame at each point the...

Page 18: ... Secure panel with two 2 nails in the corners 2 BEGIN 1 3 4 Continue attaching the panel using 2 nails 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel Ensure your floor frame is square by installing one panel and squaring frame Check the floor frame is square by measuring diagonally across the frame corners If the measuremen...

Page 19: ... floor panels and can continue at p 22 If building the 10 x 12 kit continue at page 18 If building the 10 x 16 kit continue at p 20 PARTS REQUIRED x95 10 x 8 FLOOR PANELS Not Included 6 FINISH 7 2 5 cm 92 5 8 235 cm 120 305 cm 23 7 8 61 cm 48 122 cm Flush 12 30 5 cm 6 15 cm Flush 48 x 92 5 8 122 x 235 3 cm x1 x1 Grid lines UP 5 8 x 23 7 8 x 92 5 8 1 6 x 61 x 235 cm FLOOR PANELS NOT INCLUDED SEE PA...

Page 20: ...d Section 1 Secure using 2 nails 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel 2 BEGIN 1 x1 6 15 cm edges of panel 120 305 cm 48 122 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm Flush 92 5 8 235 cm 3 4 19 mm Approximately 48 x 48 122 x 122 cm Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES AN...

Page 21: ... as shown 3 You have finished Installing your floor panels Continue on page 22 PARTS REQUIRED x95 4 FINISH 5 2 5 cm D O O R 6 15 cm edges of panel 120 305 cm 48 122 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm 23 7 8 61 cm Flush 92 5 8 235 cm 48 x 48 122 x 122 cm x1 x1 5 8 x 23 7 8 x 48 1 6 x 61 x 122 cm Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES ...

Page 22: ...1 Secure the panel using 2 nails 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel 2 BEGIN 1 48 x 96 122 x 244 cm x1 6 15 cm edges of panel 120 305 cm 96 244 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm Flush 92 5 8 235 cm 3 4 19 mm Approximately Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES AN...

Page 23: ... lines 3 You have finished Installing your floor panels Continue on page 22 PARTS REQUIRED x95 4 FINISH 5 2 5 cm 5 8 x 48 x 96 1 6 x 122 x 244 cm x1 x1 5 8 x 23 7 8 x 96 1 6 x 61 x 244 cm 6 15 cm edges of panel 120 305 cm 96 244 cm 12 30 5 cm inside panel Grid lines UP 48 122 cm 23 7 8 61 cm Flush 92 5 8 235 cm Section 2 Section 1 FLOOR PANELS NOT INCLUDED SEE PAGE 8 FOR PANEL SIZES AND QUANTITIES...

Page 24: ...alling floor panels Re level if needed The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT IMPORTANT DOOR SIDEWALL SIDEWALL FRONTWALL BACKWALL DOOR ...

Page 25: ...es to fit measurements Fig B Screw blocks in place to measurement shown Make sure blocks are square and at 125 317 5 cm You have finished building a Rafter Jig 2 3 BEGIN 1 1 1 4 3 2 cm Chalk Line Square Fig B Fig A 125 317 5 cm Flush GBB GBB OO NH NH GBB GBB Flush D O O R 18 1 2 2 1 1 4 3 2 cm Screws per block 1 x 3 x 7 1 2 2 5 x 7 6 x 19 cm x4 GBB 125 317 5 cm Rafter jig on wood floor Rafter jig ...

Page 26: ...Flip over rafter assembly and nail gusset to back side Unscrew jig and save blocks Set aside rafters and proceed to building your back wall Contact at peak 4 3 2 BEGIN 1 PARTS REQUIRED 2 x 4 x 65 7 8 5 x 10 x 167 cm 6 x 24 15 x 61 cm x6 x10 x14 x6 x10 x14 x72 CV Place two rafter halves CV on floor jig You will assemble 4 rafters D O O R NH as temporary supports OO as temporary support Rafter jig o...

Page 27: ...2 3 8 cm 1 1 2 3 8 cm 1 1 2 3 8 cm 94 1 2 240 cm Orient parts on edge on floor as shown Nail using two 3 nails at each connection 2 1 BEGIN 3 7 6 cm PB PB NH PR PARTS REQUIRED BACK WALL FRAME 3 7 6 cm Nails D O O R HINT 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm 2 x 3 x 77 5 x 7 6 x 196 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm x1 x6 x2 x1 PB NH PR ...

Page 28: ...two 3 screws at middle connection 3 4 FINISH 5 You have finished building your back wall frame PARTS REQUIRED 3 7 6 cm BACK WALL FRAME 2 x 3 x 46 1 4 5 x 7 6 x 117 5 cm x1 x2 NH 46 1 4 117 5 cm 1 1 2 3 8 cm 48 3 4 124 cm 48 3 4 124 cm NH 2 3 7 6 cm Screws ...

Page 29: ...d side facing up BEGIN Use a 3 4 gauge block at edges of panel 3 2 1 Nail using 2 nails 6 apart on edges and 12 apart inside panel Do not nail in groove BACK WALL PANELS 2 5 cm PARTS REQUIRED 3 4 GAUGE BLOCK D O O R x32 Maintain 1 measurement as shown Fig A Fig B Primed side UP For squareness maintain 3 4 measurement along panel edges x1 3 8 x 48 x 84 1 x 122 x 213 4 cm ...

Page 30: ... back frame as shown with primed side facing up 5 6 4 Use a 3 4 gauge block at edges of panel Nail using 2 nails 6 apart on edges and 12 apart inside panel Do not nail in groove BACK WALL PANELS 2 5 cm PARTS REQUIRED x32 3 4 GAUGE BLOCK D O O R You have finished attaching your back wall panels FINISH 7 To draw panels tight at seams angle nail Gauge Block x1 3 8 x 48 x 84 1 x 122 x 213 4 cm ...

Page 31: ...2 1 Secure flush to edges using eight 1 1 4 screws 10 apart You have finished building two sets of wing wall assemblies Set ONE LEFT and ONE RIGHT aside Continue building your back wall BEGIN D O O R Flush 2 1 2 6 35 cm 2 1 2 6 35 cm x2 x2 Use 2x3 s for support 10 25 4 cm Approximately OY Primed Side Down Fig A Locate OY flush to these edges WING WALL PANELS PARTS REQUIRED x32 2 x 3 x 72 5 x 7 6 x...

Page 32: ...apart Place wing wall assemblies onto frame with bottom of panels flush 6 5 You have finished attaching your wing walls FINISH 7 Do not nail in groove D O O R LEFT RIGHT HINT To draw panels tight at seams angle nail BACK WALL PANELS 2 5 cm x1 x24 x1 PARTS REQUIRED LEFT RIGHT Pre assembled Pre assembled Primed side UP Primed side UP ...

Page 33: ...sing 2 nails along edge as shown Place left gable panel onto frame primed side up and flush to left panel NOTE Panel grooves will not align Place right gable panel onto frame primed side up and flush to left panel NOTE Panel grooves will not align You have finished building your back wall FINISH 5 1 BEGIN Primed side UP Primed side UP Flush Flush Gauge Block Use a 2x3 for support Use a 2x3 for sup...

Page 34: ...o PR with two 3 nails at each end Lay out two PB one PR and one LT on edge on floor 2 Ensure LT is centered with PR and nail in place with two 3 nails 3 You have finished building your Front Wall Frame FINISH 4 BEGIN 1 FRONT WALL FRAME 3 7 6 cm PARTS REQUIRED x2 2 x 3 x 22 1 8 5 x 7 6 x 56 cm 2 x 3 x 94 1 2 5 x 7 6 x 240 cm x1 x1 x6 LT 2 x 3 x 77 5 x 7 6 x 196 cm PB PR D O O R HINT ...

Page 35: ...3 4 1 9 cm 97 1 2 247 7 cm 33 2 5 cm 3 4 GAUGE BLOCK FRONT WALL PANELS 2 3 1 BEGIN Place LEFT panel on front frame as shown with primed side up Use a 3 4 gauge block on edges of panel Nail panel to frame with 2 nails 6 apart Do not nail in groove PARTS REQUIRED x1 x22 D O O R Primed Side UP 3 4 GAUGE BLOCK 3 4 GAUGE BLOCK ...

Page 36: ...measurements 34 2 5 cm 3 4 GAUGE BLOCK FRONT WALL PANELS 5 6 4 Place RIGHT panel on front frame primed side up Use a 3 4 gauge block on edges of panel Nail panel to frame with 2 nails 6 apart Do not nail in groove To draw panels tight at seams angle nail D O O R PARTS REQUIRED x22 x1 Gauge Block Primed Side UP ...

Page 37: ...imed Side UP 7 8 You have finished attaching your wing walls FINISH 9 Place wing wall panels onto frame with bottom of panels flush Nail left and right wing wall assemblies using 2 nails 6 apart Do not nail in groove To draw panels tight at seams angle nail D O O R 6 15 2 cm 6 15 2 cm Use a 2x3 for support ...

Page 38: ...n edge on floor Measure and mark from end of boards If building 10 x 12 kit goto page 40 If building 10 x 16 kit go to page 44 IMPORTANT You will build two walls the same Use two 3 nails at each mark 3 7 6 cm PARTS REQUIRED x6 2 x 3 x 69 5 x 7 6 x 175 cm x4 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm OV x2 2 x 3 x 92 5 8 5 x 7 6 x 235 3 cm PM x14 D O O R Center on marks HINT 3 7 6 cm Nails ...

Page 39: ... 2 x 3 Fig A Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panel flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C using eleven 1 1 4 screws D O O R 1 1 4 3 2 cm 37 Fig A Fig C Fig B PRIMED SIDE Flush 3 8 10 mm 3 8 10 mm 93 1 4 236 9 cm 9 1 2 24 cm 10 x 8 SIDE WALL FRAME SOFFIT ...

Page 40: ... the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with two 2 nails in the corners Fig A 8 7 6 Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel sid...

Page 41: ...UARE AND LIP EDGES Nail using 2 nails 6 apart on edges and 12 apart inside panel 9 Carefully flip your sidewall over Repeat STEPS 1 9 to assemble your second side wall Do not nail in groove You have finished building both of your side walls Go to page 46 FINISH 10 Flush 6 15 cm 48 122 cm 12 30 cm LIP EDGE SQUARE EDGE To draw panels tight at seams angle nail D O O R ...

Page 42: ...L FRAMES 1 BEGIN 3 2 If building 10 x 12 kit orient parts on edge on floor Measure and mark from end of boards If building 10 x 16 kit go to page 44 IMPORTANT You will build two walls the same Use two 3 nails at each mark 3 7 6 cm PARTS REQUIRED x6 x2 2 x 3 x 69 5 x 7 6 x 175 cm 2 x 3 x 48 5 x 7 6 x 122 cm x4 x2 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm 7 16 x 2 1 2 x 48 1 1 x 6 4 x 122 cm OV NK x...

Page 43: ...against 2 x 3 as shown Fig A Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panels flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C using fourteen 1 1 4 screws 1 1 4 3 2 cm D O O R 41 Fig A Fig C Fig B PRIMED SIDE Flush 3 8 10 mm 3 8 10 mm 93 1 4 236 9 cm 48 122 cm 9 1 2 24 cm 10 x 12 SIDE WALL FRAME SOFFIT ...

Page 44: ...e the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with two 2 nails in the corners Fig A 8 7 6 Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel si...

Page 45: ...SQUARE AND LIP EDGES Nail using 2 nails 6 apart on edges and 12 apart inside panel 9 Carefully flip your sidewall over Repeat STEPS 1 9 to assemble your second side wall Do not nail in groove You have finished building both of your side walls Go to page 46 FINISH 10 Flush 6 15 cm 48 122 cm 12 30 cm LIP EDGE SQUARE EDGE To draw panels tight at seams angle nail D O O R ...

Page 46: ...00 5 cm 94 1 4 239 4 cm 70 1 4 178 4 cm 46 1 4 117 5 cm 48 122 cm D O O R 44 10 x 16 SIDE WALL FRAMES 1 BEGIN 2 Measure and mark from end of boards IMPORTANT You will build two walls the same Use two 3 nails at each mark 3 7 6 cm PARTS REQUIRED x6 x2 2 x 3 x 69 5 x 7 6 x 175 cm 2 x 3 x 48 5 x 7 6 x 122 cm x4 x4 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm 7 16 x 2 1 2 x 48 1 1 x 6 4 x 122 cm OV NK x2...

Page 47: ...st 2 x 3 as shown Fig A Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panels flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C using nineteen 1 1 4 screws 1 1 4 3 2 cm D O O R 45 10 x 16 SIDE WALL FRAME SOFFIT Fig A Fig C Fig B Flush 3 8 10 mm 3 8 10 mm 93 1 4 236 9 cm 48 122 cm 48 122 cm 9 1 2 24 cm PRIMED SIDE ...

Page 48: ... Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails 3 4 Gauge Block Fig A Fig B 3 4 19 mm 3 4 19 mm 2 Nails 2 Nails 7 Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Place t...

Page 49: ...UARE AND LIP EDGES Nail using 2 nails 6 apart on edges and 12 apart inside panel 8 Do not nail in groove Carefully flip your sidewall over Repeat STEPS 1 9 to assemble your second side wall You have finished building both of your side walls Go to page 46 FINISH 10 Flush 6 15 cm 48 122 cm 48 122 cm 48 122 cm 12 30 cm LIP EDGE SQUARE EDGE To draw panels tight at seams angle nail ...

Page 50: ... on the 120 305 cm floor dimension 2 BEGIN 1 First nail lower edge of panel to floor frame using 2 nails 6 apart Angle nail to hit floor frame Fig A 3 Screw back wall uprights to floor using two 3 screws Fig B 4 5 You have finished standing your back wall FINISH 120 305 cm 3 7 6 cm Screws Nail 2 nails first Angle to nail into floor frame 2 5 cm Nail Fig A 3 7 6 cm Screw 3 7 6 cm Screw 3 7 6 cm Scr...

Page 51: ... the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the upper corner Fig C Nail along the panel edge into the trim using 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig D Stand right sidewall on floor It is important to secure the sidewall in the following order Additional fasteners needed for 10 ...

Page 52: ...ide The sidewall soffit will overlap the frontwall 3 8 Fig A Nail the frontwall flush to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig B Nail the lower sidewall corner to the frontwall trim with one 2 nail Fig C 1 BEGIN Stand frontwall on floor It is important to secure the frontwall in the following order 6 15 cm 2 5 cm Nail 6 15 cm Same Measurement Side Panel Fig D Trim 2 5 ...

Page 53: ...ove Fig A Attach trim with eight 1 1 4 screws from inside Install two screws at seam Fig B Position second CDD flush to panel edge and flush to CDD already attached Fig A Attach trim with eight 1 1 4 screws from inside Install two screws at seam Fig B Repeat steps 1 2 to attach the back trim You have attached your upper trim Continue to attaching your endcaps 2 3 BEGIN 1 Fig A Fig B 8 20 3 cm Appr...

Page 54: ...he inside attach XMA with 3 4 screws as pattern shows You have attached your back wall gable trim 2 BEGIN 1 BACK WALL GABLE TRIM PARTS REQUIRED x1 XMA 11 16 x 2 1 2 x 60 5 8 1 7 x 6 3 x 154 cm 3 4 1 9 cm x11 D O O R Flush Flush GABLE TRIM LEVEL XMA XMA INSIDE 11 3 4 1 9 cm Screws 1 1 4 3 2 cm 2 1 2 6 3 cm SEAM ...

Page 55: ...er trim and corner trim and attach each endcap from inside of shed using four 1 1 4 screws as shown Fig A You have attached your endcaps Repeat steps to build two more endcaps 2 3 BEGIN 1 PARTS REQUIRED 1 1 4 3 2 cm x14 GBB GBB D O O R x4 1 x 3 x 7 1 2 2 5 x 7 6 x 19 cm GBB x4 3 4 x 5 1 8 x 8 3 8 1 9 x 13 x 21 3 cm LEFT PAINTED GREEN RIGHT PAINTED RED 4 1 1 4 3 2 cm Screws Flush Flush Fig A ...

Page 56: ...it panel into rafters using one 2 screw Fig A Repeat steps to attach three rafters Attach with two 3 screws at each end Fig B Re tighten 2 screws if neccessary You have attached your rafters Flush 3 2 BEGIN 1 PARTS REQUIRED pre assembled x3 x12 x6 Screw into top plate Align over studs Maintain the measurements between rafters 2 5 cm 2 5 cm Screw Fig A 1 2 5 cm Fig B D O O R NOTE Measurements from ...

Page 57: ...ng one panel fist You will use the panels long edge as a lever to bring your roof into square Commonly known as racking Roof panels may cause serious injury until securely fastened Attach the 48 x 96 panel with the rough side up painted grid lines side with a 1 8 measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with two 2 nails in the corners 1 BEGIN Two Nails 48 ...

Page 58: ...2 apart inside panel Fig F 3 Attach the lower roof panels flush to the upper panels and with a 1 8 measurement at the gable trim Fig G Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side 4 12 30 5 cm 6 15 cm Fig F 19 48 cm 96 244 cm 1 8 3 mm Gable Trim Flush Fig G PARTS REQUIRED 2 5 cm x90 22 1 4 56 5 cm 22 1 4 56 5...

Page 59: ...SH 3 Attach fascia trim flush under roof panel Fig A and endcaps at ends of rafters Fig B using 2 5 cm nails as shown Repeat steps to attach fascia trim on both sides You have attached your fascia trim 2 1 x 3 x 94 3 4 2 5 x 7 6 x 240 6 cm x2 HS Fig B D O O R Fig A ...

Page 60: ...n securely Attach temporary support ZJ at bottom with 1 1 4 screws in middle and 2 screws at ends Tighten securely D O O R HINT Look for 3 8 SPACER attached to doors ZJ OO Make sure spacer is attached Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws in middle 1 1 4 3 cm Screw at ends 2 5 cm Bottom edges flush 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm OO x1 x2 x2 x4 ZJ x1...

Page 61: ...u have finished installing your doors Screw hinge boards into wall supports and floor using four 3 screws as shown Make sure screws go into framing and floor Fig C D 5 3 7 6 cm Screws into the wall support and floor frame Fig B Center 3 8 measurement on right edge of groove Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Attach temporary support OO as a ledger board flush under wall panels for doors to ...

Page 62: ... as shown Fig C 4 You have finished securing your door and trim FINISH 5 BEGIN 1 Secure hinge boards from inside using 3 4 screws as shown Fig A 3 Center trim ZJ over doors and secure using eight 2 finish nails into framing as shown 2 Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams 11 Special coating screws Fig C P...

Page 63: ... x14 2 5 cm DOOR WEATHERSTRIP OO FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using seven 3 screws through outside trim into OO Fig C 4 D O O R OO Screws 2 5 cm x14 1 2 5 cm OFFSET 1 2 5 cm OFFSET Secure OO using seven 3 screws through outside trim into OO Fig B 2 Fig A Fig B Center OO in door opening 11 2...

Page 64: ...RE 3 With door closed mark hole location for bolt to extend into HINT Extend bolt to leave a mark in wood Tap bolt with hammer Drill 3 8 hole deep enough for bolt to slide into 2 Mount barrel bolt flush at top of OO on left door using 3 4 screws as shown Fig A 1 x1 x4 x7 3 4 1 9 cm HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling D O O R x1 3 4 1 9 cm Dril...

Page 65: ... x 7 6 x 35 5 cm x8 x16 3 4 19 mm BEGIN Position parts on lower pane of Door Panel as shown 2 1 Attach each using two 3 4 19 mm screws as shown You have finished attaching your door trim WNA 5 8 x 4 x 14 1 6 x 10 x 35 6 cm x8 WNA 3 4 1 9 cm x18 PARTS REQUIRED DOOR TRIM ...

Page 66: ...low directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install over roof felt or over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top o...

Page 67: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Page 68: ... 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 69: ...verlap at ridge cut to peak with a utility knife Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 7 6 9 8 SHINGLES continued If more than 5 to rain slot you must install another row of shingles 5 12 7 cm MAX To...

Page 70: ... cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 20 to 22 Pieces ...

Page 71: ...e sure there is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH 8 Flush to shingles Trim cap off flush to shingles Cap ...

Page 72: ... OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic l...

Reviews: