Ultra Tugger
®
Cable Puller and Pulling Packages
Greenlee / A Textron Company
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
38
Setup—Chain Mount
(cont’d)
1. On each vise chain unit:
a. Rotate the vise chain handle counterclockwise
to expose most of the threads. Leave only three
or four threads engaged in the handle.
b. Wrap the chain around the conduit.
c. Pull the vise chain tight and insert the chain pins
into the chain pockets, or recesses.
d. Turn the handle clockwise to slightly tighten the
chain.
2. Set the puller into the cradle of the chain mount.
3. Install two pins from the motor side. Secure the pins
with two hitch pin clips.