Ultra Tugger
®
Cable Puller and Pulling Packages
Greenlee / A Textron Company
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070
36
Setup—Versi-Boom™ System: Moving the Wheeled Carriage
Moving the Puller and Boom:
Lock the boom mount to the wheeled carriage before
moving. Align both sets of boom mount holes with both
sets of holes on carriage. Insert short pins and lock with
hitch clips. If elbow is used, fold it back against top as
shown.
Note: If boom sections longer than the stock 3' and 4'
boom tubes are used, the unit may not balance on all
four wheels. Break down long boom sections before
moving.
SECURE
SECOND PIN
If this boom section is longer
than the stock boom tube the
puller and carriage will tip
forward on the front wheels.
Wheeled carriage with boom is heavy and may be
unstable over some terrain.
Keep personnel out of path of transport.
Evaluate the terrain over which the carriage is to
move. If in doubt, obtain additional help and move
unit cautiously.
•
•
Do not transport over inclines greater than 15°.
Do not transport with boom tubes longer than the
stock 3' and 4' lengths.
Improper transport may result in tipping causing
serious injury.
15°