24
Testing Step 3 – Optimization
Testing can begin after placing the ASM300 and one or more ASC300 devices in the
premises and deploying all virtual devices onto the floor plan in the AirScout mobile
application.
1. Press
Start Test
to begin the optimization test phase.
2. The optimization phase concludes with recommendations for the optimal 2.4 GHz and
5 GHz channels and AP location. Optimizing the channel and location of the customer’s
premises equipment can result in significant performance improvements.
3. If within the timeout period a selection is not made, AirScout continues on to the next
phase of testing.