27
EN
This is a determining stage in the construction of your pool. Certain works performed in situ, like the preparation of the land, the concrete slab, the
draining... could need the intervention of professionals that will suggest the most adequate solutions.
Select the ideal location, in the sunniest spot possible, taking into account the local regulations (distance from the paths, public rights of way,
networks...) and the landscaping after installing the pool.
Your pool can be installed in these three ways: A-B-C
Try to not install your pool on recently filled land or unstable land. Whatever type of installation you choose, you should excavate and prepare the
land for levelling.
Attention: in the case that the land is sloping, you need to excavate it for levelling. Do not add soil to level it.
• In the case of assembling your pool above ground, you can use either a bed of sand or a concrete slab. If you choose the bed of sand, use fine
and clean sand, otherwise you could stain the liner due to there being algae.
• In the case that the pool is semi in-ground or completely in-ground, the installation should be using a concrete foundation slab. If a foundation
concrete slab is used this should be at least 15 centimetres thick. The pool is assembled after the concrete foundation slab has completely
dried (3 weeks). The filter group should be located below the level of the pool and ideally at the floor level of the pool.
PARTIAL OR COMPLETELY IN-GROUND INSTALLATION
According to the nature of the land, you should install a peripheral drainage and connect it to a decompression well. The well will be excavated
before the construction of the pool to avoid that the excavations fill with water during the works. It should be near the pool, a few centimetres
lower than the deepest point of the same and reach up to the surface. The decompression well is located at the most humid point. It acts as an
overflow in the case of water infiltrations or clay soil, starting from the fact that water rises quicker through a tube than through the soil.
1- Composite frame
2- Roll of alveolar protec-
tion an drainage of HDPE
EN
A
B
C
First level
Above ground
Semi in-ground
In-ground
Natural ground Anti-roots or felt
Protection and alveolar
draining roll of HDPE
Composite
frame
Concrete slab
Descompression
well
Peripheral
drainage
Watertight
film
Layer of stabilized
gravel
Geotextile
blanket
Draining gravel
ø10-30
Respect the direction of the alveolar
protection roll, with the bubbles against
the wall, to allow the composite to
“breathe”.
Summary of Contents for KPCO41
Page 34: ...34 ES EN FR DE IT NL PT OK ...