NAB M
Pict. 5.4.4
REPLACEMENT OF RUBBER ROLLER DRIVE PIN
a) Dismantle rubber roller following sequence as
“
Replacement of rubber roller assembly
“.
b) Dismantle right side guard (Pict. 5.4.3)
Referring pict.5.4.4
c) Loose chain stretcher (
273
) and open chain
(10265)
.
d) Dismantle rubber roller pinion (
304
) and take out key
(2169)
.
e) Unthread rubber roller drive pin (
9861
) and replace it.
Should bush component replacing be required proceed as
follows :
f) Unscrew the screw that fixed bush to rubber roller side.
g) Leave out snap ring (
323
).
h) Extract bearings (
324
) and oil seal (
10299
).
i) Replace worn elements. Then reassemble everything
following preceding steps in reverse order. Grease oil seal
and bearings before inserting new rubber roller drive pin.
Summary of Contents for NAB M
Page 2: ...NAB M...
Page 4: ...NAB M Page left intentionally blank...
Page 8: ...NAB M Page left intentionally blank...
Page 15: ...NAB M 1 5 GENERAL DESCRIPTION OF OPERATION 10 8 7 9 11 12 Pict 1 5 1 1 2 6...
Page 16: ...NAB M 3 4 Pict 1 5 2 5...
Page 18: ...NAB M Page left intentionally blank...
Page 21: ...NAB M Pict 2 1 1 Pict 2 3 2 Pict 2 3 1...
Page 26: ...NAB M Pict 2 8 1 2 8 STARTING THE MACHINE 16 17 10 27 21 24 28...
Page 34: ...NAB M Page left intentionally blank...
Page 36: ...NAB M 4 1 CLEANING AND WASHING Pict 4 1 1 Pict 4 1 2 Pict 4 1 3 Pict 4 1 4...
Page 40: ...NAB M 5 1 POINTS OF PREVENTIVE MAINTENANCE Pict 5 1 1 MO...
Page 52: ...NAB M 6 1 PNEUMATIC SYSTEM...
Page 54: ...NAB M Page left intentionally blank...
Page 58: ...NAB M Page left intentionally blank...
Page 68: ...NAB M 9 6 RUBBER ROLLER...
Page 76: ...NAB M 9 10 CANVAS OUTFEED BELT 21225DX 21225SX...
Page 78: ...NAB M 9 11 INFEED MODULAR BELT...
Page 80: ...NAB M 9 12 OUTFEED MODULAR BELT...
Page 82: ...NAB M 9 13 ELECTRIC SYSTEM...