KayakDD-1 Digital Production Switcher
M4 thread drilling
Thread drillings
for panel fastening
(17.24 inch)
(0.2 inch)
(2.95 inch)
(10.55 inch)
Bold dimensions are [mm]
Figure 11
Bottom View, Measurements of the Mounting Points
Fastening screw
Lock nut
Washer
Panel Fastening Procedure:
The length of the screw is dependent on the
thickness of the tabletop! The M4 screw
should be approx. 25 mm of (1 inch) longer
than the thickness of the tabletops.
Screw lock nut completely on the fastening
screw and put on a washer.
Then turn the fastening screw from below
through the drillings in the table in the
thread drillings of the frame.
At least turn the locking nut up to fix the
panel.
Figure 12
Panel Fastening Procedure
Planning and Installation Manual
41
Summary of Contents for KayakDD-1
Page 8: ...KayakDD 1 Digital Production Switcher Planning and Installation Manual 7 ...
Page 9: ...KayakDD 1 Digital Production Switcher 8 Planning and Installation Manual ...
Page 11: ...KayakDD 1 Digital Production Switcher 10 Planning and Installation Manual ...
Page 15: ...KayakDD 1 Digital Production Switcher 14 Planning and Installation Manual ...
Page 33: ...KayakDD 1 Digital Production Switcher 32 Planning and Installation Manual ...
Page 89: ...KayakDD 1 Digital Production Switcher 88 Planning and Installation Manual ...
Page 90: ...KayakDD 1 Digital Production Switcher Planning and Installation Manual 89 ...