DOOR ASSEMBLY
5.7
Slide the (2) S02 bolts down the track of the L21. See . Align with the holes on the 603A door header. With one person
inside the greenhouse line up hanging door track L21 with door header 603D, move bolts on L21 to line up with bolt holes on
door header 603A. From the inside hand tighten the ML01 nut while the person outside is holding the L21 in position, you will
now center on the front of the greenhouse and tighten the S02/ML01 combo.
Side Profile View of
L21 Hanging Track
Inside View
Track
S02
SCREW
53
L21
603A
S02
Summary of Contents for Grandio Element 6x4 with Base Kit
Page 67: ...NOTES NOTES...