5.
INTERNAL
C
ABINET
Graf UK Ltd
10
Ground
First
WWT inlet pipe
The One2clean control panel supplies compressed air through a 19mm and 13mm Hose to the underground tank. Hoses should be housed inside 4" drainage pipe or similar.
Internal Sampling Chamber
To drainage field or water course
Wastewater level
Tubular diffuser located in the base of tank
Below ground Wastewater Tank.
625
Soil Stack All treatable waste water to enter treatment plant via soil stack
Clear water discharge pipe tubular diffuser located in the base of tank
DN100
< 18m
WC
13mm PVC Hose (black/red) Fixed with Jubilee Clip
19mm PVC Hose (blue) Fixed with Jubilee Clip
13mm PVC Hose (black/red) Fixed with Jubilee Clip
19mm PVC Hose (blue) Fixed with Jubilee Clip
One2clean Internal Control Panel The controller requires its own, permanent adequately fused (13 amp) 230V power supply. Fitted with Isolator switch for maintenance and repair
Low level air vent
DO NOT SCALE - IF IN DOUBT ASK
DRAWING No.
P0
REV.
DESCRIPTION
INTERNAL CABINET
PROJECT
ONE2CLEAN
DRAWN :
CHECKED :
DS
MC
DATE :
SCALE :
07.10.20
NTS@A3
ISSUE
REV.
P0
DESCRIPTION
BY
FOR GUIDANCE
DS
07.10.20
DATE
THIS DOCUMENT IS SUPPLIED IN STRICT CONFIDENCE AND MUST NOT BE LENT, REPRODUCED OR DISCLOSED TO ANY THIRD PARTY WITHOUT
THE WRITTEN CONSENT OF SCP WATER MANAGEMENT LIMITED
NOTES:-
GRAF UK Limited
Graf UK Limited | Regen House | Beaumont Road | Banbury | OX16 1RH
T: 01608 661500 F: 01295 211333
E: [email protected] www.grafuk.co.uk
ONE2CLEAN_INTERNAL CABINET